Nokturnal Quality Portal
Nokturnal's quality policy, everyone's QMS duties, audit readiness and who owns each process, in one place.
Quality Policy · F-520-001
Our Commitment to Excellence
Quality Objectives & KPI's
"We are intelligent, adaptive, and integrated."
Mission statement, F-520-001
Mission
Vision
Service + Leadership
We put the warfighter first in every decision and lift each other up with humility, responsibility, and strength.
Resilience + Accountability
We step up when it matters most, go the extra mile even in adversity, and count on each other to deliver when the stakes are highest.
Innovation + Agility
We think outside the box, challenge traditional methods, and leverage our agility to rapidly deliver cutting-edge solutions to complex problems.
QMS Documentation Hierarchy · QM-001
- Quality Manual (Level 1)
- Policies (Level 2)
- Procedures (Level 3)
- Work Instructions (Level 4)
- Forms & Records (Level 5)
Employee Roles
How You Contribute
Every person at Nokturnal plays a part in maintaining our QMS. Click a role to see its quality responsibilities. Role names are the ones the Quality Manual and procedures use.
Senior Leadership — CEO and executive team · QM-001 §5
- Set the Quality Policy, objectives, mission, vision and values, and keep them communicated
- Run SWOT & Process Analysis (F-610-001) and act on risks and opportunities per SOP-610-001
- Hold Management Review (F-930-001 agenda) and all-hands meetings
- Provide the resources the QMS needs
- Make sure product safety and configuration management requirements are built into the processes
- The CEO or designee notifies customers within 2 business days of any escape (QM-001 §7.4)
Vice President of Operations — Operations leadership · P-830-001 §3
- Oversee product development and establish technical direction
- Ensure compliance with standards and report development progress to executive management and the Board
- Ensure the product development lifecycle methodology is documented and followed
- Oversee configuration management, part numbering and lifecycle management (SOP-831-001)
- Ensure product safety processes are implemented throughout the product lifecycle
- Assign an investigator and due date to corrective action requests and track them (SOP-1000-001)
Department Managers — Mid-Level Leadership
- Approve controlled documents for your area and assign authors (SOP-750-001)
- Support QMS and regulatory compliance within your department
- Attend internal audit opening and closing meetings and follow up corrective actions (SOP-920-001)
- Disposition nonconforming product within your authority (SOP-870-001)
- Ensure processes are delivering intended outputs
- Ensure QMS integrity is maintained when changes are planned
All Employees — Every Team Member
- Complete your assigned training on time (Take an eLearning course)
- Report suspected violations in good faith; retaliation is prohibited (P-730-001)
- Raise an NCR in Odoo when you find a nonconformance (SOP-1000-001, Raise and find an NCR)
- Use only the current controlled version of a document; printed copies are uncontrolled
- Protect proprietary and export-controlled information
- Follow the documented procedures and work instructions for your role
- Maintain identification and traceability of product at all times, including work in progress
Management Representative — Contract and Compliance Specialist · QM-001 §5.3
- Oversee QMS conformance to AS9100 requirements
- Ensure processes are delivering intended outputs across the organization
- Report on QMS performance and opportunities for improvement
- Has organizational freedom and unrestricted access to Senior Leadership to resolve quality matters
- Promote customer focus throughout the company
- Prevent falsification of data
- May act as liaison with external parties on QMS matters
Key Quality Activities
Internal Audits
Nonconformance Reporting
Continual Improvement
Department Quality Roles
My Department
Select your department to see how your team contributes to the QMS, which objectives you affect, and where the work is done.
Engineering
Design · Development · Verification
Engineering teams own the technical quality of Nokturnal's products. From requirements capture through design reviews, verification and validation, and configuration control, engineering carries AS9100 design and development compliance.
Design & Development
- Execute assigned technical tasks per program requirements and SOW
- Maintain design outputs that meet functional and performance requirements
- Take part in design reviews (PDR, CDR, TRR) with recorded evidence (F-830-007 PDR Record, F-830-008 DR-PDR template)
- Make sure design inputs (requirements) are specified and traceable
- Record verification and validation results in the DVP&R workbook, F-830-003
Configuration Management
- Control drawings and documentation per SOP-831-001 and F-731-001
- Raise an ECR in Odoo (QMS › Change Management › Engineering Change Requests) for changes that need formal control (P-830-002; course)
- Keep BOMs right in Odoo: eBOM in ProtoRel, released Normal BOM in EngRel (P-830-002)
- Make sure released drawings are at the correct revision and authorized
- Tick Critical Part on a part record when it is a critical item per the program quality plan or drawing (WI-831-001)
Product Safety
- Report any identified or suspected safety hazard immediately
- Follow all safety-related procedures and work instructions
- Do not deviate from safety-critical processes without approval
- Know the critical items relevant to your work area
- Take part in Safety Risk Assessments when asked (SOP-814-001)
Records & Reporting
- Report progress in Odoo Project and enter your hours on your weekly timecard, Home › Timecards (Fill in and certify your weekly timecard)
- Keep design specifications, test reports and source code in the controlled locations (GitLab repositories are linked to Odoo projects)
- Keep design review records and V&V reports
- Deliver work products on schedule with complete documentation
Program Management
Planning · Execution · Customer Interface
Program Managers carry quality on every contract: contract review and classification, gate planning, risk management, customer communication, and making sure deliverables meet requirements before they ship.
Contract & Gate Planning
- Review every new contract with the F-820-001 Contract Review Form in Odoo: Start Contract Review on the project
- Classify it with the F-820-002 Contract Classification Form: Programs & Projects › Program Control › Governance › Contract Classifications (Classify and review a new contract)
- Set the initial release state (ProtoRel / EngRel / ProdRel) in classification section 4B (P-830-002)
- Plan the design review gates (PDR, CDR, TRR) in the Program Management Plan, Governance › PMPs
- Identify customer quality clauses and flowdowns (Apply FAR and DFARS flowdowns)
Risk & Issue Management
- Keep program risks on the project in Odoo: Risks button, or Programs & Projects › Risks › My Projects' Risks (course)
- Lead Safety Risk Assessments for assigned programs (SOP-814-001); record them as risks with the Safety category
- Record on the PMP whether the program has critical items or key characteristics, with a link to the list
- Make sure safety features are incorporated into designs
- Escalate high and extreme risks to the CEO (SOP-820-002 §6.4.3)
Customer Communication
- Act as primary customer interface for technical and programmatic matters
- Contact the customer when nonconforming product is found after delivery, and for concessions on use-as-is or repaired product (SOP-870-001)
- Confirm and document customer requirements before committing to supply
- Tell customers about planned changes that could affect product quality before they take effect (QM-001 §7.4)
- Get feedback from the customer and pass it on (SOP-820-001 §2.5)
Delivery Quality
- Own deliverable quality and customer satisfaction on your programs
- Manage the schedule and budget in Odoo Project; approve your team's timecards (Approve your team's timecards and time off)
- Track deliverables and due dates in Odoo (Track deliverables, extensions and closeout)
- Keep program expenditures within the approved budget
- Report program status in the weekly project report (Fill in your project's weekly report)
Production & Integration
Build · Inspect · Deliver
Production is where quality becomes physical. Every build, inspection and delivery tests Nokturnal's quality commitments. Traceability, work instructions and nonconformance control are critical here.
Build & Traceability
- Follow work instructions and kit lists per the Production Core Process Diagram
- Maintain identification and traceability of product at all times, including WIP
- Work manufacturing orders and work orders in Odoo (Work a manufacturing job on the shop floor)
- Verify the BOM before starting a production build
- Protect customer-furnished property; report any loss or damage immediately
Inspection & Acceptance
- Perform incoming inspection against the purchase order and drawings (WI-860-002; Receive and inspect purchased parts)
- Verify identification, quantity and condition of received items in Odoo
- Review certificates of conformance and test reports from suppliers
- Perform in-process and final inspection and record results (SOP-850-001, WI-860-001)
- Run a First Article Inspection when one is required (course)
Nonconformance Control
- Document supplier product or service quality problems immediately
- Segregate nonconforming material; do not use it until it is dispositioned
- Raise an NCR in Odoo (QMS › Nonconformance › Nonconformances); hold the job if needed (Hold a manufacturing job with an NCR)
- Support root cause analysis and corrective action
- Never conceal a nonconformance
Material, Tools & Storage
- Handle and store materials to prevent damage or deterioration
- Keep material identified in the stock area at all times
- Use only calibrated measuring tools (QMS › Calibration › Devices; course)
- Keep materials traceable to their C of Cs and test reports
Quality, Contracts & Compliance
QMS Oversight · Contracts · Export Control
These duties belong to the Management Representative (the Contract and Compliance Specialist, QM-001 §5.3) and the Quality Manager role named in the procedures. It owns supplier evaluation, contract compliance review, QMS oversight and audit coordination.
QMS Oversight
- Keep unrestricted access to Senior Leadership on quality matters
- Oversee QMS conformance to AS9100 across all departments
- Support the Executive Vice President or designee with the internal audit schedule (F-920-001, SOP-920-001)
- Drive corrective actions from audit findings to closure in Odoo (QMS › Quality Management › Audits; course)
- Quality Manager approval of contract classifications (F-820-002 section 9)
Supplier Quality
- Evaluate and approve suppliers before they supply materials (SOP-840-001 §2.1)
- Keep the Approved Supplier List in Odoo: QMS › Suppliers › Approved Supplier List (course)
- Summarize supplier nonconformances for Management Review
- Issue and track Supplier Quality Reports (F-840-002)
- Make sure the right quality clauses (F-840-004) are flowed down on purchases
Contract Compliance
- Conduct export control review and classification (SOP-820-001 §2.4) under the Export Compliance Policy, P-825-001
- Review contract terms for compliance and make sure requirements are flowed down
- Verify contract review completeness
- Monitor customer satisfaction metrics and facilitate customer corrective action responses
- Coordinate customer notifications on regulatory and safety matters
Contract Administration
- Make sure a new contract or delivery order is entered within 5 business days of receipt (quality objective, F-520-001)
- Review and document compliance requirements before contract execution
- Provide conflict mineral (3TG) certifications when customers require them
- Manage REACH/RoHS declarations when applicable
Purchasing / Supply Chain
Procurement · Supplier Management · Receiving
Purchasing controls the front door of every product Nokturnal builds. Supplier qualification, purchase requirements and counterfeit part prevention are this team's critical quality contributions.
Supplier Qualification
- Buy only from suppliers on the Approved Supplier List when the material affects product or service quality
- Have new suppliers complete the Supplier Survey Questionnaire (F-840-001)
- Use customer-approved special process sources when required
- Never use brokers for electronic parts without the counterfeit risk assessment (F-840-005)
Purchase Requirements
- Purchase requests start in Odoo, Purchase › Purchase Reqs › My Purchase Reqs, with the quality clause codes (F-840-004) and project flowdowns
- After approval, the buyer places the purchase order in Odoo (Purchase › Purchasing › Purchase Orders; Execute purchase orders on the buyer board)
- Include accurate part numbers, revisions, quantity and required delivery date
- Include qualification and certification requirements
- Keep purchase records with their compliance documentation
Receiving & Verification
- Verify purchased product against the order before use or entry into stock
- Check identification, quantity and condition of every order received
- Obtain and review C of Cs, test reports and material certifications
- Record the receipt in Odoo to show acceptance (Receive, move and find stock)
- Quarantine suspect or nonconforming items; do not mix them with good stock
Counterfeit Prevention
- Follow the Counterfeit Control Plan, SOP-840-002, for electronic parts
- Screen broker buys with the Counterfeit Risk Assessment, F-840-005
- Never accept parts without proper traceability documentation
- Report suspected counterfeit parts immediately and keep them segregated
Finance
Budget · Cost Tracking · Resource Allocation
Finance makes sure Nokturnal has the resources to meet its quality commitments. Finance keeps the books in QuickBooks and loads them into Odoo Accounting each month (Accounting › QuickBooks › Import). Cost tracking, budget support for quality activities and integrity in financial reporting are this department's quality contributions.
Resource Support
- Make sure there are financial resources for product development and quality activities
- Support program budget planning and resource allocation
- Monitor the financial side of product development and improvements
- Make sure quality investments support organizational objectives
Integrity & Compliance
- Keep accurate financial records; never falsify cost or budget data
- Support government contract financial reporting requirements
- Hold monthly cost reviews with Program Managers (SOP-820-002 §6.2.1)
- Support Management Review with financial performance data
Research & Development
Innovation · Feasibility · Technology Maturation
R&D work is either Research Services (reports and analysis are the deliverable, SOP-851-001) or design work in ProtoRel under SOP-830-001. The contract classification decides which. See the Research Services tab.
Research Documentation
- Keep records sufficient to recreate the work and substantiate conclusions (SOP-851-001 §6.2)
- Document negative results: what was tried, why it did not work, lessons learned
- Keep the OneDrive project folder current: contract, deliverables, technical work products
- Support patent applications for novel innovations
ProtoRel Controls
- Keep an eBOM in Odoo for each prototype, approved by the Engineering or Project Lead before the first build (P-830-002)
- Iterate without formal ECR/ECO, except changes to customer requirements, safety-critical features or critical items, interfaces or regulatory requirements, which need documented review and approval
- Keep informal build notes legible and retained; they are QMS records
- Move to EngRel at PDR completion (P-830-002 §5)
Technology Transfer
- Make the transition from research to product development (NPD) effective
- Hand over knowledge, test data and documentation to engineering teams
- Evaluate new technologies for competitive advantage and customer value
- The CEO leads research initiatives and coordinates technology transfer (P-830-001 §3)
SBIR / STTR Programs
- Make SBIR/STTR deliverables meet the contract's technical requirements
- Re-classify the contract if the scope moves to deliverable hardware/software for deployment (TRL 7+)
- Keep essential oversight of configuration, risk and technical compliance
- Mature technologies toward transition readiness
P-730-001 Business Ethics · P-500-003 Legal and Compliance · P-825-001 Export Compliance
Ethics & Compliance
Nokturnal upholds high ethical standards through an active ethics and legal compliance program. Every employee has a personal responsibility to act with integrity in all situations.
Ethics & Integrity
Report any potential conflict of interest in writing to the Compliance Manager. Deal fairly and lawfully; never collude with competitors. All personnel read and acknowledge the Business Ethics Policy every year.
Export Control
Comply with ITAR and EAR. The Empowered Official owns the Export Compliance Program; report red flags or suspected violations within 24 hours to the Empowered Official or Export Compliance Administrator (P-825-001).
Government Contracting
Every contract is reviewed for applicable compliance requirements before execution (F-820-001). Compliance evidence is kept as documented information.
Intellectual Property
Protect proprietary information, trade secrets and IP rights. Handle proprietary and export-controlled data only in authorized systems.
Employee Obligations
What You Must Do
- Complete all required compliance training on time
- Report suspected violations in good faith to the appropriate channel
- Support QMS compliance activities within your role
- Cooperate with investigations and internal audits
- Handle data only within authorized systems
What You Must Never Do
- Falsify data, records or quality documents, ever
- Share export-controlled or proprietary information without authorization
- Retaliate against anyone reporting a compliance concern
- Bypass established quality processes or skip documentation
- Ignore or conceal product nonconformances
Conflict Minerals
Environmental Compliance
Continual Awareness
AS9100 Audit Preparation
Audit FAQ
Questions auditors ask employees during AS9100 walk-around interviews. Auditors assess awareness, not just paperwork.
What is Nokturnal's quality policy? · Policy
Nokturnal.AI and its employees are committed to meeting customer and legal requirements in order to achieve customer satisfaction. We will always strive to provide quality products on time and continually improve our Quality Management System.
What are Nokturnal's quality objectives / KPIs? · Policy
Product Acceptance by Customer ≥ 95%, On Time Delivery ≥ 90%, contract or delivery order entered within 5 business days of receipt ≥ 95% of the time, Supplier Quality ≥ 90%, Supplier OTD ≥ 90%, and Commercial Customer Satisfaction Score ≥ 3.5.
How do you contribute to the QMS in your role? · Policy
Describe your daily quality activities: following work instructions, keeping records, reporting issues, taking part in reviews. Auditors want to see that you understand your personal connection to quality, not just that a policy exists.
What happens if you don't follow quality procedures? · Policy
Not conforming to QMS requirements can lead to nonconforming product reaching customers, regulatory violations, loss of certification, contract penalties or safety incidents. Internally it leads to a nonconformance and corrective action, and may lead to disciplinary action.
Are you aware of any ongoing quality issues or corrective actions in your area? · Policy
Be honest. If there are open corrective actions or known issues, describe them and what is being done. Auditors know problems exist; they want to see the system resolving them.
How do you know what procedures apply to your job? · Process
Applicable procedures are identified in your job description, the Core Process Diagrams in the Quality Manual and your onboarding training. Controlled documents live in the SharePoint Master Document Library and are indexed in Odoo at Forms & Documents › Documents › Document Map and on the intranet Policies / Procedures page. Changes are communicated through meetings, email, Teams and management updates (QM-001 §7.4).
How are design changes controlled? · Process
It depends on the release state (P-830-002). In ProtoRel, iterative changes are allowed without formal ECR/ECO, but changes to customer requirements, safety-critical features or critical items, interface control documents or regulatory requirements need documented review and approval first. In EngRel, changes are controlled with documented rationale, and changes affecting customer requirements, safety or interfaces need a formal ECR/ECO. In ProdRel, changes are exception-based and formally approved through ECR/ECO and the CCB (SOP-831-001). ECRs and ECOs are worked in Odoo, QMS › Change Management.
Can you walk me through how a new contract gets reviewed and entered? · Process
Each function reviews a new contract or delivery order with the F-820-001 Contract Review Form, done in Odoo with Start Contract Review on the project. Technical, legal, export control, quality and finance requirements are identified and the risk is rated. If the risk is higher than Medium, the President must accept it. The contract is then classified with the F-820-002 Contract Classification Form at Programs & Projects › Program Control › Governance › Contract Classifications, which decides which QMS procedures apply. Contracts are entered within 5 business days of receipt.
How do you verify that purchased product meets requirements before using it? · Process
Receiving checks the delivery against the purchase order for identification, quantity and condition, and reviews Certificates of Conformance, test reports and other required documents. Inspection is done when required. The receipt is recorded in Odoo to show acceptance. Items that fail are quarantined and not used.
What is an internal audit and when was the last one in your area? · Process
Internal audits are conducted per SOP-920-001 to verify that the QMS conforms to AS9100, customer, statutory and regulatory requirements and our own procedures. Each process is audited at least once a year per the master schedule (F-920-001). Auditors record evidence on Objective Evidence Records (F-920-003); findings are tracked to closure in the QMS module in Odoo.
How long are quality records retained? · Records
Suppliers must keep records at least 10 years from shipment unless the order says otherwise (quality clause QC06, F-840-004). Nokturnal's own records are kept for the retention periods in the F-750-001 Master Document List & Control of Records Table in SharePoint (SOP-750-001 §7), or longer if a customer or regulation requires.
How do you ensure product traceability throughout the build process? · Records
Product identification and traceability is maintained at all times, including work in progress (QM-001 §8.5). Serial and lot numbers, manufacturing orders, kit lists and BOM revisions are tracked in Odoo, and materials trace back to their C of Cs, test reports and purchase orders.
Where are your work instructions / procedures stored and are they current? · Records
Documented information is controlled per SOP-750-001. The controlled documents live in the SharePoint Master Document Library and are indexed in Odoo at Forms & Documents › Documents › Document Map and on the intranet Policies / Procedures page, each with its current revision. Printed copies are uncontrolled. Always use the current approved version.
Can you show me the training records for your area? · Records
New hires get QMS awareness training (F-720-002) and a competency evaluation (F-720-001) within 90 days of hire (QM-001 §7.2, §7.3). Assigned courses and completions are kept in Odoo eLearning; your courses are on the intranet Courses page. HR maintains training records (SOP-720-006).
What do you do if you discover a nonconforming product? · Nonconformance
Stop and segregate the item; do not use or ship it. Tag it to prevent use. Raise a nonconformance in Odoo per SOP-870-001 and tell your supervisor. Management decides the disposition: rework, scrap, return to supplier, or use as is / repair with customer concession.
What is a corrective action and when is one required? · Nonconformance
A corrective action eliminates the cause of a nonconformance that has occurred and prevents it recurring. Any employee who finds a nonconformance initiates a request in the Odoo QMS module (SOP-1000-001, WI-870-001). The Vice President of Operations assigns an investigator and due date where needed and tracks it; top management reviews corrective actions from internal audits (SOP-920-001). An action is closed only when it is verified effective.
What happens if a nonconforming product has already shipped to a customer? · Nonconformance
This is an "escape." The CEO or designee notifies the customer within 2 business days of discovery (QM-001 §7.4). The Program Manager contacts the customer, takes remedial action and investigates, and starts a corrective action in Odoo when appropriate (SOP-870-001 §5.2).
How do you identify and control nonconforming material in your area? · Nonconformance
Nonconforming material is physically separated from good stock and tagged, or placed in a designated quarantine or scrap area (product to be scrapped is tagged or marked red). It is logged in Odoo as a nonconformance. No one may use, ship or incorporate it without a formal disposition.
Are there any critical items or key characteristics on the product you work on? · Safety
A critical item is an item (function, part, software, characteristic or process) whose failure, absence or degradation could cause injury or death, loss or serious damage to a major end item, mission failure or significant environmental damage. A key characteristic is an attribute whose variation significantly affects fit, performance, service life or manufacturability (SOP-814-001 §4). Contract review asks whether they have been identified (F-820-001 items 18–19). In Odoo the program's Program Management Plan records Critical Items / Key Characteristics with a link to the list, the Contract Classification flags Key Characteristics as a special requirement, parts that are critical items carry the Critical Part box in PLM (WI-831-001), and inspection checkpoints can be classed Critical in the QMS checkpoint templates.
What would you do if you identified a potential product safety issue? · Safety
Report it immediately to your supervisor and the Program Manager. Do not continue work that could introduce or worsen a hazard. The Program Manager leads a Safety Risk Assessment (SOP-814-001), recorded as a risk on the project in Odoo with the Safety category, and high and extreme risks are escalated to the CEO (SOP-820-002 §6.4.3). Never deviate from safety-critical processes without approval.
Are you aware of any export control (ITAR/EAR) requirements on your current work? · Safety
Much of Nokturnal's defense and aerospace work involves export-controlled technology. ITAR and EAR apply to technical data, hardware and software. Export-controlled items are handled only in authorized systems and shared only with authorized people. Each contract's classification records whether it is ITAR or EAR controlled. The Export Compliance Policy, P-825-001, governs all export activity.
How do you prevent counterfeit parts from entering your supply chain? · Safety
Nokturnal follows the Counterfeit Control Plan, SOP-840-002. Suppliers that affect product quality come from the Approved Supplier List. Purchases of electronic parts from brokers need a counterfeit risk assessment (F-840-005). Parts must have traceability documentation: C of Cs, test reports and manufacturer certifications. Suspect parts are segregated and reported immediately.
What is Nokturnal's right-of-access policy for customers and regulators? · Safety
Nokturnal provides right of access for its customers, its customers' customers, and statutory and regulatory authorities to the applicable areas of all facilities, at any level of the supply chain, involved in the order and to all applicable records (QM-001 §7.4). Be cooperative and professional during customer or regulatory visits.
Internal Audit · SOP-920-001 · F-920-001
Audit Prep
What auditors look at for each process and what to have ready. Dates, auditors and the agenda for each audit come from the current internal audit plan.
Opening meeting
During the audit
Closing meeting
Have ready, by process (F-920-001 audit areas)
Leadership & Quality · Clauses 4, 5, 6, 7 (not 7.1.3–7.1.5), 9, 10
- QMS documents: the current Quality Manual and governing documents from the SharePoint Master Document Library (Document Map); be ready to explain the QMS scope and why all requirements apply
- Context (4): internal and external issues, interested parties (QM-001 §4.2), process interactions, SWOT & Process Analysis (F-610-001)
- Leadership (5): connect the Quality Policy, objectives, responsibilities and customer focus to current decisions
- Planning & improvement (6, 10): current risks (QMS › Quality Management › Risks › All Risks), quality objectives, improvement actions, NCR/CAPA evidence and effectiveness checks (Nonconformances, CAPA Actions)
- Support (7): competency (F-720-001), awareness (F-720-002), training records (eLearning), communication and document control
- Performance (9): KPI trends and targets (Home › KPI), customer feedback, prior audit status and Management Review inputs and actions (QMS › Quality Management › Reviews; agenda F-930-001)
Order Review & Planning · Clauses 8.1, 8.2
- A contract or order traced from review before acceptance: the F-820-001 contract review and F-820-002 classification in Odoo (Contract Classifications)
- Customer, statutory, regulatory and special requirements, and the flowdowns that carry them (Apply FAR and DFARS flowdowns)
- Records of requirement changes and how they were communicated to affected teams
- Program planning: the PMP (Governance › PMPs), risks, deliverables and configuration requirements
Purchasing · Clause 8.4
- The auditor will likely pick a purchased item or outside service and trace it from supplier selection through purchase, receipt, verification and supplier monitoring
- Supplier approval status, approved scope and qualification or re-evaluation evidence (QMS › Suppliers › Approved Supplier List)
- Quality clauses and project flowdowns on the purchase request in Odoo, and the purchase order the buyer placed in Odoo
- Receiving results and inspection against the order, drawing, C of C and acceptance requirements (QMS › Receiving › Inspections (Receiving))
- Supplier quality and OTD results (Home › KPI; Purchase › Reporting › Supplier On-Time Delivery) and actions for poor performance; supplier corrective actions
- Counterfeit-part prevention evidence where it applies (SOP-840-002, F-840-005)
Production · Clauses 7.1.3, 7.1.4, 7.1.5, 8.5, 8.6, 8.7
- The auditor will likely pick an active or recent build and trace how it was planned, performed, inspected, released and recorded
- The current manufacturing order, drawing, BOM and work instructions at the point of use
- Material, lot/serial, operator and configuration traceability in Odoo
- Calibrated tools and their status (QMS › Calibration › Devices); ESD and FOD controls
- In-process and final inspection evidence, First Article Inspection where required (FAI Records), and authorized product release
- Identification, segregation and disposition of nonconforming product (Nonconformances)
Design & Development · Clauses 8.3, 8.1.2, 8.1.4
- The auditor will likely pick one project or deliverable and trace it from approved requirements through design reviews, verification and validation, configuration control and release
- The design plan and release state: the PMP and the classification's section 4B (P-830-002)
- Traceability from requirements to controlled drawings, BOMs, software and acceptance criteria; V&V results in the DVP&R (F-830-003)
- Design review records (F-830-007 PDR Record, F-830-008 DR-PDR) with decisions, actions and authorization to proceed
- Configuration baselines and change control in Odoo PLM (ECRs) and GitLab, and CRB approval before ProdRel
- Product safety, critical item and key characteristic controls where they apply (PMP, classification, Critical Part flag); risks on the project
Be ready for your session
- Know your role and the process you perform
- Use the current controlled document from the Master Document Library
- Open live records in Odoo, GitLab or SharePoint/OneDrive; auditors want objective evidence, not presentations
- Be ready to trace one recent, real example
- Answer directly; if unsure, bring in the process owner
- Do not make duplicate or uncontrolled copies for the audit
SOP-851-001 Research Services · SOP-830-001 · F-820-002
Research Services
For projects where the deliverable is reports, data, analysis or documentation. These projects follow SOP-851-001 instead of the formal design controls of SOP-830-001.
SOP-851-001 Research Services applies to
- SBIR Phase I and Phase II feasibility studies and research
- STTR collaborative research programs
- Basic and exploratory research, trade studies and algorithm development
- Contracts where the primary deliverable is reports, analysis or documentation
- Research and development up to TRL 6 (prototype demonstration in a relevant environment)
SOP-830-001 Design & Development Control applies to
- Production contracts
- Deliverable hardware or software products for operational deployment (TRL 7+)
- Safety-critical development
- Any contract where classification section 4 (Design Control) is YES
Technology Readiness Level (TRL) boundary
| TRL | Maturity | Usually governed by |
|---|---|---|
| 1 | Basic principles observed | SOP-851-001 Research Services |
| 2 | Technology concept formulated | SOP-851-001 Research Services |
| 3 | Experimental proof of concept | SOP-851-001 Research Services |
| 4 | Validated in lab environment | SOP-851-001 Research Services |
| 5 | Validated in relevant environment | SOP-851-001 Research Services |
| 6 | Prototype demo in relevant environment | SOP-851-001 Research Services |
| 7 | Prototype demo in operational environment | SOP-830-001 Design & Development |
| 8 | System complete and qualified | SOP-830-001 Design & Development |
| 9 | System proven in operations | SOP-830-001 Design & Development |
TRL 1–6: SOP-851-001 generally applies. Beyond TRL 6 toward operational deployment: SOP-830-001 generally applies (SOP-851-001 §3). TRL is a guide; the contract classification is the decision.
What SOP-851-001 requires
Initiation (§6.1, Program Manager)
- Establish the project in Odoo Project
- Create a project folder in OneDrive
- Communicate project objectives and the deliverable schedule to the research team
Execution (§6.2)
- Iterate, experiment and adapt methods as the work progresses
- Keep records sufficient to recreate the work and substantiate conclusions; format is the researcher's choice (lab notebooks, memos, annotated code)
- Keep the Program Manager informed; submit customer reports per the contract schedule
- Document negative results: what was tried, why it did not succeed, lessons learned
Closeout (§6.4)
- Submit final deliverables and obtain customer acceptance
- Organize project files in OneDrive for future access
- Hold a brief lessons learned discussion with the team (record it with Governance › Lessons Learned)
- Close the project in Odoo
Records for a Research Services project
| Record | Where | Why the auditor cares |
|---|---|---|
| Contract Classification | Odoo, Governance › Contract Classifications, section 3 Research Services | The decision that SOP-851-001 applies. Lead with it. |
| Contract Review | Odoo, Contract Review on the project (F-820-001) | Requirements reviewed before acceptance |
| Contract and customer correspondence | OneDrive project folder (§7) | The requirements baseline for research work |
| Submitted deliverables | OneDrive project folder (§7) | Reports, data and analysis traceable to the contract |
| Technical work products | OneDrive project folder (§7) | Data, code, analysis and notes that support the conclusions |
| Customer acceptance | OneDrive project folder | Email or signed acceptance of each deliverable (§6.4) |
| Project record | Odoo Project | Status, team and deliverable tracking from start to close |
| Negative results and lessons learned | OneDrive project folder; Odoo Lessons Learned | SOP-851-001 requires them (§6.2, §6.4) |
Likely auditor questions
This project has no BOM, no drawings and no DVP&R. Where are your design controls? · Research
The contract classification put this project under SOP-851-001 Research Services because the primary deliverable is reports and analysis, not a product for operational deployment. Formal clause 8.3 design controls are not required for this scope; SOP-851-001 has its own required elements, shown above.
How do you make sure research deliverables meet the customer's requirements? · Research
The contract is reviewed before acceptance and kept in the OneDrive project folder. Deliverables are provided per the contract and Program Management Plan (§6.3), and customer acceptance is kept. The Program Manager owns the customer relationship and makes sure deliverables meet contract requirements.
How do you handle negative results or failed approaches? · Research
SOP-851-001 treats them as valuable knowledge: document what was attempted, why it did not succeed and the lessons learned, and keep it with the project files.
How do you know when a research project needs formal design controls? · Research
SOP-851-001 does not apply to production contracts, deliverable hardware or software for operational deployment (TRL 7+), or safety-critical development. When the scope changes, the contract is re-classified in Odoo (Start Review reopens the classification) and SOP-830-001 applies if section 4 becomes YES. Classifications are also reviewed on the Review Schedule.
Does research documentation have to follow a template? · Research
No. The format is at the researcher's discretion (lab notebooks, technical memos, annotated code or other formats) as long as the records are sufficient to recreate the work and substantiate the conclusions.
Who is responsible for quality on research projects? · Research
The Program Manager owns execution and the customer relationship. The research team does the technical work and keeps the documentation. Quality provides oversight for regulatory compliance and steps in only when compliance issues arise (SOP-851-001 §5).
Do
- Lead with the contract classification; it justifies everything that follows
- Show the OneDrive folder: contract, deliverables, technical work products
- Show customer acceptance of deliverables (email is fine)
- Know your TRL and whether the work is research (≤ TRL 6) or heading to deployment
- Show documented negative results and lessons learned
- Name SOP-851-001 and explain it exists for this kind of work
Don't
- Apologize for having no DVP&R or BOM; SOP-851-001 does not require them
- Say "we don't track this project"; SOP-851-001 requires an Odoo project and a OneDrive folder
- Be unable to show customer acceptance of delivered reports
- Claim research scope after the work has moved to TRL 7+ deployment without re-classifying
- Confuse "no formal design controls" with "no controls at all"
Process Ownership Reference
Who Manages What?
Search by area, role or procedure to find who owns a QMS process. Roles are the ones named in each procedure.
Design & Development
SOP-830-001 · P-830-001 · P-830-002
- Senior Owner
- Vice President of Operations (P-830-001) Primary
- Design Authority
- Project Lead (assigned per program) Lead
- Oversight
- Quality/Compliance Manager Support
- Approvals
- Senior Leadership Team Major Decisions
Customer Related Processes
SOP-820-001
- Senior Owner
- VP of Business Development Primary
- Final Authority
- Executive Vice President or designee Approver
- Compliance
- Contract and Compliance Specialist Support
- Technical
- Program Managers Interface
Purchasing & Supplier Management
SOP-840-001 · SOP-840-002
- Primary
- Contract and Compliance Specialist (supplier approval) Primary
- Purchasing
- Office Support – Purchaser Execute
- Inspection
- Production / Manufacturing Technician Verify
- Periodic Review
- Top Management Mgmt Review
Production & Service Provision
SOP-850-001
- Product Conformity
- Program Managers Primary
- Operations
- Production and Supply Chain Manager Plan
- Inspection
- Quality Assurance Verify
- Execution
- Production personnel (engineers, technicians) Execute
Internal Audits
SOP-920-001 · F-920-001
- Scheduling
- Executive Vice President or designee Primary
- Execution
- Audit Coordinator (selected by management) Lead
- Audit Team
- Certified internal auditors (may be outsourced) Audit
- CA Review
- Top Management Review
Configuration Management
SOP-831-001 · F-731-001
- Senior Owner
- Vice President of Operations (part numbering & lifecycle) Primary
- Board
- Configuration Review Board (CRB) · CCB Approve
- Compliance
- Quality / Compliance Support
- Documents
- Engineering Create
Risk Management
SOP-610-001 · F-610-001
- Senior Owner
- Executive Management Primary
- Strategic
- Leadership team (SWOT & Process Analysis) SWOT
- Programs
- Program Managers (SOP-820-002 §6.4) Projects
Program Management
SOP-820-002
- Process Owner
- Program Managers Primary
- Assigns PM
- Vice President of Operations Senior
- Plan Approval
- CEO (programs >$1M, >2 years or SBIR Phase III) Approve
Order Review & Planning
F-820-001 · F-820-002 · Core Process 1
- Acceptance
- Executive Vice President or designee Primary
- Technical
- Program Managers Execute
- Contracts
- Contract and Compliance Specialist Review
- Risk Above Medium
- President Accept
Research & Development
SOP-851-001 · Core Process 2
- Execution
- Program Manager Primary
- Research
- Research Team Execute
- Oversight
- Quality (regulatory compliance) Support
- Research Lead
- CEO (Chris Holmes Parker; P-830-001) Strategy
Control of Nonconforming Product
SOP-870-001 · WI-870-001
- Disposition
- Management (Quality Assurance per SOP-850-001) Primary
- Customer
- Program Manager (concessions, post-delivery) Contact
- Escapes
- CEO or designee Notify
- Reporting
- Any employee Identify
Continual Improvement & Corrective Action
SOP-1000-001
- Tracking
- Vice President of Operations (assigns investigator, due date) Primary
- Initiation
- All employees Raise
Documented Information
SOP-750-001 · F-750-001
- Master List
- Vice President of Operations or designee Primary
- Approval
- Management, for its own area Approver
- Storage
- IT & Cybersecurity Manager (Giovonni Alfaro; cloud storage) Support
Product Safety
SOP-814-001
- Accountable
- CEO Primary
- Coordinates
- Product Safety Representative (PSR) Lead
- Programs
- Program Managers (Safety Risk Assessments) Execute
Export Compliance
P-825-001
- Program Owner
- Empowered Official Primary
- Day-to-Day
- Export Compliance Administrator Operate
- Programs
- Program / Project Managers Flow down
Finance & Resource Allocation
P-500-005
- Process Owner
- Chief Financial Officer (Ilana Gat) Primary
- Co-Owner
- Program Managers Budget
No matching areas found. Try a role name, SOP number, or process keyword.
The individual(s) responsible for coordinating product safety activities: facilitating safety assessments, liaising with customers on safety matters, monitoring regulatory changes and reporting safety issues to management. The role may be assigned to the CEO, the Quality Manager or a designated Program Engineer (SOP-814-001 §3).
Ownership by Role
Senior Management Ownership Summary
| Role | QMS Areas Owned / Led | Key Procedures |
|---|---|---|
| CEO (Chris Holmes Parker) | Quality Manual ApprovalResearch InitiativesProduct SafetyExternal CommunicationsCustomer EscapesHigh & Extreme Program Risks | QM-001, P-830-001, SOP-814-001, SOP-820-002 |
| Vice President of Operations | Design & DevelopmentConfiguration ManagementPM AssignmentCorrective Action TrackingMaster Document List | P-830-001, SOP-831-001, SOP-820-002, SOP-1000-001, SOP-750-001 |
| Executive Vice President | Internal Audit ScheduleOrder AcceptanceContract Final Authority | SOP-920-001, SOP-820-001 |
| Chief Financial Officer (Ilana Gat) | Finance & ResourcesBudget AllocationFinancial Risk | P-500-005 |
| VP of Business Development | Customer EngagementProposals & OrdersRequirements Determination | SOP-820-001 |
| Quality Manager | Design Control OversightContract Classification ApprovalQMS DocumentsQuality Oversight | SOP-830-001, F-820-002, SOP-851-001 |
| Contract and Compliance Specialist (Management Representative) | QMS ConformanceSupplier Approval / ASLCounterfeit PreventionContract ComplianceCustomer Satisfaction Metrics | QM-001, SOP-840-001, SOP-840-002, SOP-820-001 |
| Program Managers (assigned per program) | Program ManagementProduct ConformityCustomer CommunicationResearch ProjectsProgram Risks & Safety Assessments | SOP-820-002, SOP-850-001, SOP-851-001, SOP-814-001 |
Quick Reference
Acronym Glossary
Definitions for terms and abbreviations used across Nokturnal's Quality Management System.
| Term | Stands for | Area | Definition |
|---|---|---|---|
| 3TG | Tantalum, Tin, Tungsten & Gold | Compliance | The four "conflict minerals" regulated under the Dodd-Frank Act. Nokturnal.AI provides written certification on 3TG content when customers require it (QM-001 §4.2). |
| AS9100 | Aerospace Quality Management Standard | Quality System | The quality management standard for aviation, space and defense organizations. Nokturnal's QMS is built to meet it (QM-001). |
| ASL | Approved Supplier List | Procurement | The list of suppliers approved to supply Nokturnal. Kept in Odoo at QMS › Suppliers › Approved Supplier List. |
| BOM | Bill of Materials | Procurement | A structured list of all components, sub-assemblies and raw materials needed to build a product, with quantities and part numbers. An eBOM is the engineering BOM used in ProtoRel. |
| CAPA / CAR | Corrective and Preventive Action / Corrective Action Request | Quality System | The record used to find a problem's root cause and fix it so it does not recur (SOP-1000-001). Tracked in Odoo at QMS › Nonconformance › CAPA Actions. |
| CCB | Change Control Board | Quality System | Approves Class I changes to released parts and moves parts to Obsolete (F-731-001, SOP-831-001). |
| CDR | Critical Design Review | Design Review | A formal review held mid-EngRel that establishes the design baseline. Follows PDR (P-830-002). |
| CRB | Configuration Review Board | Quality System | The board whose unanimous approval moves a part from Confirmed to Released, and which must approve the EngRel → ProdRel transition (F-731-001, P-830-002). |
| DVP&R | Design Verification and Validation Plan & Report | Design Review | The workbook (F-830-003) that records how each design requirement is verified and validated, and the results (SOP-830-001). |
| EAR | Export Administration Regulations | Compliance | U.S. regulations controlling the export of commercial and dual-use goods and technology (P-825-001). |
| ECO | Engineering Change Order | Quality System | The authorization to implement an approved design or documentation change. Worked in Odoo at QMS › Change Management. |
| ECP | Engineering Change Proposal | Quality System | A proposal to change a contract deliverable, submitted to the customer for approval before implementation. |
| ECR | Engineering Change Request | Quality System | A request to change a design or document. It is reviewed first and, when approved, implemented through an ECO. |
| EngRel | Engineering Release | Design Review | The release state for a repeatable engineering baseline: versioned drawings, released Normal BOM and basic work instructions (P-830-002). Shown in Odoo as EngREL. |
| FAI | First Article Inspection | Production | Inspection of the first production item to show the process can produce conforming product (AS9102). Recorded in Odoo under QMS › Manufacturing › First Article Inspection. |
| FIFO | First In, First Out | Production | An inventory method where the oldest stock is used first. |
| ICD | Interface Control Document | Design Review | A document defining the physical and functional interfaces between systems or subsystems. Changes to ICDs always need documented review and approval (P-830-002). |
| IP | Intellectual Property | Compliance | Patents, trade secrets, proprietary designs and technical data owned by Nokturnal or its customers. Must be protected per company policy and contract requirements. |
| ITAR | International Traffic in Arms Regulations | Compliance | U.S. regulations controlling the export of defense articles, services and technical data (P-825-001). |
| KC | Key Characteristic | Design Review | An attribute or feature whose variation significantly affects product fit, performance, service life or manufacturability (SOP-814-001). |
| KPI | Key Performance Indicator | Quality System | A measure of a quality objective (F-520-001). Shown in Odoo at Home › KPI. |
| NCR | Nonconformance Report | Quality System | A record of a product, service or process that does not meet a requirement. Raised in Odoo at QMS › Nonconformance and tracked to closure. |
| NPD | New Product Development | Design Review | Taking a product from concept through design, verification, validation and release to production. |
| OER | Objective Evidence Record | Quality System | The internal audit form (F-920-003) where auditors record evidence and nonconformances. |
| OFI | Opportunity for Improvement | Quality System | An audit observation that is not a nonconformance but could improve the process (SOP-920-001). |
| OTD | On Time Delivery | Procurement | The share of deliveries made on or before the committed date. Targets: ≥ 90% to customers and ≥ 90% from suppliers (F-520-001). |
| PAC | Product Acceptance by Customer | Production | The rate at which customers accept delivered products without rejection. Target: ≥ 95% (F-520-001). |
| PDR | Preliminary Design Review | Design Review | An early review of the design concept against requirements. ProtoRel moves to EngRel at PDR completion (P-830-002). Record: F-830-007. |
| PMP | Program Management Plan | Design Review | The program's plan (F-820-004 template), kept in Odoo at Programs & Projects › Program Control › Governance › PMPs. |
| PO / PR | Purchase Order / Purchase Request | Procurement | The purchase request starts in Odoo with its quality clauses and flowdowns; after approval the buyer places the purchase order in Odoo (SOP-840-001). |
| ProdRel | Production Release | Design Review | The release state for production: final BOM, drawings and work instructions, with formal ECR/ECO/CCB change control (P-830-002). Shown in Odoo as ProdREL. |
| ProtoRel | Prototype Release | Design Review | The release state for R&D and first builds: eBOM, iterative change control (P-830-002). Shown in Odoo as ProtoREL. |
| PSR | Product Safety Representative | Quality System | The individual(s) who coordinate product safety activities; may be the CEO, the Quality Manager or a designated Program Engineer (SOP-814-001). |
| QMS | Quality Management System | Quality System | The policies, processes, procedures and records that define how Nokturnal ensures product quality and continual improvement, built to AS9100. |
| REACH | Registration, Evaluation, Authorisation & Restriction of Chemicals | Compliance | EU regulation controlling hazardous substances in products. Nokturnal informs customers of restricted substances when required. |
| RFQ | Request for Quotation | Procurement | A request to suppliers for price and lead time on parts or services. |
| RoHS | Restriction of Hazardous Substances | Compliance | EU directive limiting specific hazardous materials (e.g. lead, mercury, cadmium) in electronic products, where it applies. |
| SBIR / STTR | Small Business Innovation Research / Small Business Technology Transfer | Procurement | Federal programs funding early-stage R&D; STTR requires collaboration with a research institution (SOP-851-001). |
| SOP | Standard Operating Procedure | Quality System | A controlled procedure. The controlled copy lives in the SharePoint Master Document Library and is indexed in Odoo's Document Map; always use the current revision. |
| SOW | Statement of Work | Procurement | The contract document defining the tasks, deliverables, schedule and standards a contractor must meet. |
| SRA | Safety Risk Assessment | Quality System | A systematic process to identify hazards, assess risks and set mitigations (SOP-814-001). |
| SWOT | Strengths, Weaknesses, Opportunities & Threats | Compliance | The analysis leadership uses with F-610-001 to assess risks and opportunities (SOP-610-001). |
| TRL | Technology Readiness Level | Design Review | A 1–9 scale of technology maturity. Research Services typically apply through TRL 6 (SOP-851-001). |
| TRR | Test Readiness Review | Design Review | A review confirming the product and test setup are ready for formal testing. EngRel → ProdRel follows CDR and TRR plus CRB approval (P-830-002). |
| WIP | Work In Progress | Production | Products or assemblies that have started the build but are not yet completed and accepted. Identification and traceability apply to WIP too. |
No matching acronyms found. Try a different keyword.
Nokturnal Quality Portal
Nokturnal's quality policy, everyone's QMS duties, audit readiness and who owns each process, in one place.
Quality Policy · F-520-001
Our Commitment to Excellence
Quality Objectives & KPI's
"We are intelligent, adaptive, and integrated."
Mission statement, F-520-001
Mission
Vision
Service + Leadership
We put the warfighter first in every decision and lift each other up with humility, responsibility, and strength.
Resilience + Accountability
We step up when it matters most, go the extra mile even in adversity, and count on each other to deliver when the stakes are highest.
Innovation + Agility
We think outside the box, challenge traditional methods, and leverage our agility to rapidly deliver cutting-edge solutions to complex problems.
QMS Documentation Hierarchy · QM-001
- Quality Manual (Level 1)
- Policies (Level 2)
- Procedures (Level 3)
- Work Instructions (Level 4)
- Forms & Records (Level 5)
Employee Roles
How You Contribute
Every person at Nokturnal plays a part in maintaining our QMS. Click a role to see its quality responsibilities. Role names are the ones the Quality Manual and procedures use.
Senior Leadership — CEO and executive team · QM-001 §5
- Set the Quality Policy, objectives, mission, vision and values, and keep them communicated
- Run SWOT & Process Analysis (F-610-001) and act on risks and opportunities per SOP-610-001
- Hold Management Review (F-930-001 agenda) and all-hands meetings
- Provide the resources the QMS needs
- Make sure product safety and configuration management requirements are built into the processes
- The CEO or designee notifies customers within 2 business days of any escape (QM-001 §7.4)
Vice President of Operations — Operations leadership · P-830-001 §3
- Oversee product development and establish technical direction
- Ensure compliance with standards and report development progress to executive management and the Board
- Ensure the product development lifecycle methodology is documented and followed
- Oversee configuration management, part numbering and lifecycle management (SOP-831-001)
- Ensure product safety processes are implemented throughout the product lifecycle
- Assign an investigator and due date to corrective action requests and track them (SOP-1000-001)
Department Managers — Mid-Level Leadership
- Approve controlled documents for your area and assign authors (SOP-750-001)
- Support QMS and regulatory compliance within your department
- Attend internal audit opening and closing meetings and follow up corrective actions (SOP-920-001)
- Disposition nonconforming product within your authority (SOP-870-001)
- Ensure processes are delivering intended outputs
- Ensure QMS integrity is maintained when changes are planned
All Employees — Every Team Member
- Complete your assigned training on time (Take an eLearning course)
- Report suspected violations in good faith; retaliation is prohibited (P-730-001)
- Raise an NCR in Odoo when you find a nonconformance (SOP-1000-001, Raise and find an NCR)
- Use only the current controlled version of a document; printed copies are uncontrolled
- Protect proprietary and export-controlled information
- Follow the documented procedures and work instructions for your role
- Maintain identification and traceability of product at all times, including work in progress
Management Representative — Contract and Compliance Specialist · QM-001 §5.3
- Oversee QMS conformance to AS9100 requirements
- Ensure processes are delivering intended outputs across the organization
- Report on QMS performance and opportunities for improvement
- Has organizational freedom and unrestricted access to Senior Leadership to resolve quality matters
- Promote customer focus throughout the company
- Prevent falsification of data
- May act as liaison with external parties on QMS matters
Key Quality Activities
Internal Audits
Nonconformance Reporting
Continual Improvement
Department Quality Roles
My Department
Select your department to see how your team contributes to the QMS, which objectives you affect, and where the work is done.
Engineering
Design · Development · Verification
Engineering teams own the technical quality of Nokturnal's products. From requirements capture through design reviews, verification and validation, and configuration control, engineering carries AS9100 design and development compliance.
Design & Development
- Execute assigned technical tasks per program requirements and SOW
- Maintain design outputs that meet functional and performance requirements
- Take part in design reviews (PDR, CDR, TRR) with recorded evidence (F-830-007 PDR Record, F-830-008 DR-PDR template)
- Make sure design inputs (requirements) are specified and traceable
- Record verification and validation results in the DVP&R workbook, F-830-003
Configuration Management
- Control drawings and documentation per SOP-831-001 and F-731-001
- Raise an ECR in Odoo (QMS › Change Management › Engineering Change Requests) for changes that need formal control (P-830-002; course)
- Keep BOMs right in Odoo: eBOM in ProtoRel, released Normal BOM in EngRel (P-830-002)
- Make sure released drawings are at the correct revision and authorized
- Tick Critical Part on a part record when it is a critical item per the program quality plan or drawing (WI-831-001)
Product Safety
- Report any identified or suspected safety hazard immediately
- Follow all safety-related procedures and work instructions
- Do not deviate from safety-critical processes without approval
- Know the critical items relevant to your work area
- Take part in Safety Risk Assessments when asked (SOP-814-001)
Records & Reporting
- Report progress in Odoo Project and enter your hours on your weekly timecard, Home › Timecards (Fill in and certify your weekly timecard)
- Keep design specifications, test reports and source code in the controlled locations (GitLab repositories are linked to Odoo projects)
- Keep design review records and V&V reports
- Deliver work products on schedule with complete documentation
Program Management
Planning · Execution · Customer Interface
Program Managers carry quality on every contract: contract review and classification, gate planning, risk management, customer communication, and making sure deliverables meet requirements before they ship.
Contract & Gate Planning
- Review every new contract with the F-820-001 Contract Review Form in Odoo: Start Contract Review on the project
- Classify it with the F-820-002 Contract Classification Form: Programs & Projects › Program Control › Governance › Contract Classifications (Classify and review a new contract)
- Set the initial release state (ProtoRel / EngRel / ProdRel) in classification section 4B (P-830-002)
- Plan the design review gates (PDR, CDR, TRR) in the Program Management Plan, Governance › PMPs
- Identify customer quality clauses and flowdowns (Apply FAR and DFARS flowdowns)
Risk & Issue Management
- Keep program risks on the project in Odoo: Risks button, or Programs & Projects › Risks › My Projects' Risks (course)
- Lead Safety Risk Assessments for assigned programs (SOP-814-001); record them as risks with the Safety category
- Record on the PMP whether the program has critical items or key characteristics, with a link to the list
- Make sure safety features are incorporated into designs
- Escalate high and extreme risks to the CEO (SOP-820-002 §6.4.3)
Customer Communication
- Act as primary customer interface for technical and programmatic matters
- Contact the customer when nonconforming product is found after delivery, and for concessions on use-as-is or repaired product (SOP-870-001)
- Confirm and document customer requirements before committing to supply
- Tell customers about planned changes that could affect product quality before they take effect (QM-001 §7.4)
- Get feedback from the customer and pass it on (SOP-820-001 §2.5)
Delivery Quality
- Own deliverable quality and customer satisfaction on your programs
- Manage the schedule and budget in Odoo Project; approve your team's timecards (Approve your team's timecards and time off)
- Track deliverables and due dates in Odoo (Track deliverables, extensions and closeout)
- Keep program expenditures within the approved budget
- Report program status in the weekly project report (Fill in your project's weekly report)
Production & Integration
Build · Inspect · Deliver
Production is where quality becomes physical. Every build, inspection and delivery tests Nokturnal's quality commitments. Traceability, work instructions and nonconformance control are critical here.
Build & Traceability
- Follow work instructions and kit lists per the Production Core Process Diagram
- Maintain identification and traceability of product at all times, including WIP
- Work manufacturing orders and work orders in Odoo (Work a manufacturing job on the shop floor)
- Verify the BOM before starting a production build
- Protect customer-furnished property; report any loss or damage immediately
Inspection & Acceptance
- Perform incoming inspection against the purchase order and drawings (WI-860-002; Receive and inspect purchased parts)
- Verify identification, quantity and condition of received items in Odoo
- Review certificates of conformance and test reports from suppliers
- Perform in-process and final inspection and record results (SOP-850-001, WI-860-001)
- Run a First Article Inspection when one is required (course)
Nonconformance Control
- Document supplier product or service quality problems immediately
- Segregate nonconforming material; do not use it until it is dispositioned
- Raise an NCR in Odoo (QMS › Nonconformance › Nonconformances); hold the job if needed (Hold a manufacturing job with an NCR)
- Support root cause analysis and corrective action
- Never conceal a nonconformance
Material, Tools & Storage
- Handle and store materials to prevent damage or deterioration
- Keep material identified in the stock area at all times
- Use only calibrated measuring tools (QMS › Calibration › Devices; course)
- Keep materials traceable to their C of Cs and test reports
Quality, Contracts & Compliance
QMS Oversight · Contracts · Export Control
These duties belong to the Management Representative (the Contract and Compliance Specialist, QM-001 §5.3) and the Quality Manager role named in the procedures. It owns supplier evaluation, contract compliance review, QMS oversight and audit coordination.
QMS Oversight
- Keep unrestricted access to Senior Leadership on quality matters
- Oversee QMS conformance to AS9100 across all departments
- Support the Executive Vice President or designee with the internal audit schedule (F-920-001, SOP-920-001)
- Drive corrective actions from audit findings to closure in Odoo (QMS › Quality Management › Audits; course)
- Quality Manager approval of contract classifications (F-820-002 section 9)
Supplier Quality
- Evaluate and approve suppliers before they supply materials (SOP-840-001 §2.1)
- Keep the Approved Supplier List in Odoo: QMS › Suppliers › Approved Supplier List (course)
- Summarize supplier nonconformances for Management Review
- Issue and track Supplier Quality Reports (F-840-002)
- Make sure the right quality clauses (F-840-004) are flowed down on purchases
Contract Compliance
- Conduct export control review and classification (SOP-820-001 §2.4) under the Export Compliance Policy, P-825-001
- Review contract terms for compliance and make sure requirements are flowed down
- Verify contract review completeness
- Monitor customer satisfaction metrics and facilitate customer corrective action responses
- Coordinate customer notifications on regulatory and safety matters
Contract Administration
- Make sure a new contract or delivery order is entered within 5 business days of receipt (quality objective, F-520-001)
- Review and document compliance requirements before contract execution
- Provide conflict mineral (3TG) certifications when customers require them
- Manage REACH/RoHS declarations when applicable
Purchasing / Supply Chain
Procurement · Supplier Management · Receiving
Purchasing controls the front door of every product Nokturnal builds. Supplier qualification, purchase requirements and counterfeit part prevention are this team's critical quality contributions.
Supplier Qualification
- Buy only from suppliers on the Approved Supplier List when the material affects product or service quality
- Have new suppliers complete the Supplier Survey Questionnaire (F-840-001)
- Use customer-approved special process sources when required
- Never use brokers for electronic parts without the counterfeit risk assessment (F-840-005)
Purchase Requirements
- Purchase requests start in Odoo, Purchase › Purchase Reqs › My Purchase Reqs, with the quality clause codes (F-840-004) and project flowdowns
- After approval, the buyer places the purchase order in Odoo (Purchase › Purchasing › Purchase Orders; Execute purchase orders on the buyer board)
- Include accurate part numbers, revisions, quantity and required delivery date
- Include qualification and certification requirements
- Keep purchase records with their compliance documentation
Receiving & Verification
- Verify purchased product against the order before use or entry into stock
- Check identification, quantity and condition of every order received
- Obtain and review C of Cs, test reports and material certifications
- Record the receipt in Odoo to show acceptance (Receive, move and find stock)
- Quarantine suspect or nonconforming items; do not mix them with good stock
Counterfeit Prevention
- Follow the Counterfeit Control Plan, SOP-840-002, for electronic parts
- Screen broker buys with the Counterfeit Risk Assessment, F-840-005
- Never accept parts without proper traceability documentation
- Report suspected counterfeit parts immediately and keep them segregated
Finance
Budget · Cost Tracking · Resource Allocation
Finance makes sure Nokturnal has the resources to meet its quality commitments. Finance keeps the books in QuickBooks and loads them into Odoo Accounting each month (Accounting › QuickBooks › Import). Cost tracking, budget support for quality activities and integrity in financial reporting are this department's quality contributions.
Resource Support
- Make sure there are financial resources for product development and quality activities
- Support program budget planning and resource allocation
- Monitor the financial side of product development and improvements
- Make sure quality investments support organizational objectives
Integrity & Compliance
- Keep accurate financial records; never falsify cost or budget data
- Support government contract financial reporting requirements
- Hold monthly cost reviews with Program Managers (SOP-820-002 §6.2.1)
- Support Management Review with financial performance data
Research & Development
Innovation · Feasibility · Technology Maturation
R&D work is either Research Services (reports and analysis are the deliverable, SOP-851-001) or design work in ProtoRel under SOP-830-001. The contract classification decides which. See the Research Services tab.
Research Documentation
- Keep records sufficient to recreate the work and substantiate conclusions (SOP-851-001 §6.2)
- Document negative results: what was tried, why it did not work, lessons learned
- Keep the OneDrive project folder current: contract, deliverables, technical work products
- Support patent applications for novel innovations
ProtoRel Controls
- Keep an eBOM in Odoo for each prototype, approved by the Engineering or Project Lead before the first build (P-830-002)
- Iterate without formal ECR/ECO, except changes to customer requirements, safety-critical features or critical items, interfaces or regulatory requirements, which need documented review and approval
- Keep informal build notes legible and retained; they are QMS records
- Move to EngRel at PDR completion (P-830-002 §5)
Technology Transfer
- Make the transition from research to product development (NPD) effective
- Hand over knowledge, test data and documentation to engineering teams
- Evaluate new technologies for competitive advantage and customer value
- The CEO leads research initiatives and coordinates technology transfer (P-830-001 §3)
SBIR / STTR Programs
- Make SBIR/STTR deliverables meet the contract's technical requirements
- Re-classify the contract if the scope moves to deliverable hardware/software for deployment (TRL 7+)
- Keep essential oversight of configuration, risk and technical compliance
- Mature technologies toward transition readiness
P-730-001 Business Ethics · P-500-003 Legal and Compliance · P-825-001 Export Compliance
Ethics & Compliance
Nokturnal upholds high ethical standards through an active ethics and legal compliance program. Every employee has a personal responsibility to act with integrity in all situations.
Ethics & Integrity
Report any potential conflict of interest in writing to the Compliance Manager. Deal fairly and lawfully; never collude with competitors. All personnel read and acknowledge the Business Ethics Policy every year.
Export Control
Comply with ITAR and EAR. The Empowered Official owns the Export Compliance Program; report red flags or suspected violations within 24 hours to the Empowered Official or Export Compliance Administrator (P-825-001).
Government Contracting
Every contract is reviewed for applicable compliance requirements before execution (F-820-001). Compliance evidence is kept as documented information.
Intellectual Property
Protect proprietary information, trade secrets and IP rights. Handle proprietary and export-controlled data only in authorized systems.
Employee Obligations
What You Must Do
- Complete all required compliance training on time
- Report suspected violations in good faith to the appropriate channel
- Support QMS compliance activities within your role
- Cooperate with investigations and internal audits
- Handle data only within authorized systems
What You Must Never Do
- Falsify data, records or quality documents, ever
- Share export-controlled or proprietary information without authorization
- Retaliate against anyone reporting a compliance concern
- Bypass established quality processes or skip documentation
- Ignore or conceal product nonconformances
Conflict Minerals
Environmental Compliance
Continual Awareness
AS9100 Audit Preparation
Audit FAQ
Questions auditors ask employees during AS9100 walk-around interviews. Auditors assess awareness, not just paperwork.
What is Nokturnal's quality policy? · Policy
Nokturnal.AI and its employees are committed to meeting customer and legal requirements in order to achieve customer satisfaction. We will always strive to provide quality products on time and continually improve our Quality Management System.
What are Nokturnal's quality objectives / KPIs? · Policy
Product Acceptance by Customer ≥ 95%, On Time Delivery ≥ 90%, contract or delivery order entered within 5 business days of receipt ≥ 95% of the time, Supplier Quality ≥ 90%, Supplier OTD ≥ 90%, and Commercial Customer Satisfaction Score ≥ 3.5.
How do you contribute to the QMS in your role? · Policy
Describe your daily quality activities: following work instructions, keeping records, reporting issues, taking part in reviews. Auditors want to see that you understand your personal connection to quality, not just that a policy exists.
What happens if you don't follow quality procedures? · Policy
Not conforming to QMS requirements can lead to nonconforming product reaching customers, regulatory violations, loss of certification, contract penalties or safety incidents. Internally it leads to a nonconformance and corrective action, and may lead to disciplinary action.
Are you aware of any ongoing quality issues or corrective actions in your area? · Policy
Be honest. If there are open corrective actions or known issues, describe them and what is being done. Auditors know problems exist; they want to see the system resolving them.
How do you know what procedures apply to your job? · Process
Applicable procedures are identified in your job description, the Core Process Diagrams in the Quality Manual and your onboarding training. Controlled documents live in the SharePoint Master Document Library and are indexed in Odoo at Forms & Documents › Documents › Document Map and on the intranet Policies / Procedures page. Changes are communicated through meetings, email, Teams and management updates (QM-001 §7.4).
How are design changes controlled? · Process
It depends on the release state (P-830-002). In ProtoRel, iterative changes are allowed without formal ECR/ECO, but changes to customer requirements, safety-critical features or critical items, interface control documents or regulatory requirements need documented review and approval first. In EngRel, changes are controlled with documented rationale, and changes affecting customer requirements, safety or interfaces need a formal ECR/ECO. In ProdRel, changes are exception-based and formally approved through ECR/ECO and the CCB (SOP-831-001). ECRs and ECOs are worked in Odoo, QMS › Change Management.
Can you walk me through how a new contract gets reviewed and entered? · Process
Each function reviews a new contract or delivery order with the F-820-001 Contract Review Form, done in Odoo with Start Contract Review on the project. Technical, legal, export control, quality and finance requirements are identified and the risk is rated. If the risk is higher than Medium, the President must accept it. The contract is then classified with the F-820-002 Contract Classification Form at Programs & Projects › Program Control › Governance › Contract Classifications, which decides which QMS procedures apply. Contracts are entered within 5 business days of receipt.
How do you verify that purchased product meets requirements before using it? · Process
Receiving checks the delivery against the purchase order for identification, quantity and condition, and reviews Certificates of Conformance, test reports and other required documents. Inspection is done when required. The receipt is recorded in Odoo to show acceptance. Items that fail are quarantined and not used.
What is an internal audit and when was the last one in your area? · Process
Internal audits are conducted per SOP-920-001 to verify that the QMS conforms to AS9100, customer, statutory and regulatory requirements and our own procedures. Each process is audited at least once a year per the master schedule (F-920-001). Auditors record evidence on Objective Evidence Records (F-920-003); findings are tracked to closure in the QMS module in Odoo.
How long are quality records retained? · Records
Suppliers must keep records at least 10 years from shipment unless the order says otherwise (quality clause QC06, F-840-004). Nokturnal's own records are kept for the retention periods in the F-750-001 Master Document List & Control of Records Table in SharePoint (SOP-750-001 §7), or longer if a customer or regulation requires.
How do you ensure product traceability throughout the build process? · Records
Product identification and traceability is maintained at all times, including work in progress (QM-001 §8.5). Serial and lot numbers, manufacturing orders, kit lists and BOM revisions are tracked in Odoo, and materials trace back to their C of Cs, test reports and purchase orders.
Where are your work instructions / procedures stored and are they current? · Records
Documented information is controlled per SOP-750-001. The controlled documents live in the SharePoint Master Document Library and are indexed in Odoo at Forms & Documents › Documents › Document Map and on the intranet Policies / Procedures page, each with its current revision. Printed copies are uncontrolled. Always use the current approved version.
Can you show me the training records for your area? · Records
New hires get QMS awareness training (F-720-002) and a competency evaluation (F-720-001) within 90 days of hire (QM-001 §7.2, §7.3). Assigned courses and completions are kept in Odoo eLearning; your courses are on the intranet Courses page. HR maintains training records (SOP-720-006).
What do you do if you discover a nonconforming product? · Nonconformance
Stop and segregate the item; do not use or ship it. Tag it to prevent use. Raise a nonconformance in Odoo per SOP-870-001 and tell your supervisor. Management decides the disposition: rework, scrap, return to supplier, or use as is / repair with customer concession.
What is a corrective action and when is one required? · Nonconformance
A corrective action eliminates the cause of a nonconformance that has occurred and prevents it recurring. Any employee who finds a nonconformance initiates a request in the Odoo QMS module (SOP-1000-001, WI-870-001). The Vice President of Operations assigns an investigator and due date where needed and tracks it; top management reviews corrective actions from internal audits (SOP-920-001). An action is closed only when it is verified effective.
What happens if a nonconforming product has already shipped to a customer? · Nonconformance
This is an "escape." The CEO or designee notifies the customer within 2 business days of discovery (QM-001 §7.4). The Program Manager contacts the customer, takes remedial action and investigates, and starts a corrective action in Odoo when appropriate (SOP-870-001 §5.2).
How do you identify and control nonconforming material in your area? · Nonconformance
Nonconforming material is physically separated from good stock and tagged, or placed in a designated quarantine or scrap area (product to be scrapped is tagged or marked red). It is logged in Odoo as a nonconformance. No one may use, ship or incorporate it without a formal disposition.
Are there any critical items or key characteristics on the product you work on? · Safety
A critical item is an item (function, part, software, characteristic or process) whose failure, absence or degradation could cause injury or death, loss or serious damage to a major end item, mission failure or significant environmental damage. A key characteristic is an attribute whose variation significantly affects fit, performance, service life or manufacturability (SOP-814-001 §4). Contract review asks whether they have been identified (F-820-001 items 18–19). In Odoo the program's Program Management Plan records Critical Items / Key Characteristics with a link to the list, the Contract Classification flags Key Characteristics as a special requirement, parts that are critical items carry the Critical Part box in PLM (WI-831-001), and inspection checkpoints can be classed Critical in the QMS checkpoint templates.
What would you do if you identified a potential product safety issue? · Safety
Report it immediately to your supervisor and the Program Manager. Do not continue work that could introduce or worsen a hazard. The Program Manager leads a Safety Risk Assessment (SOP-814-001), recorded as a risk on the project in Odoo with the Safety category, and high and extreme risks are escalated to the CEO (SOP-820-002 §6.4.3). Never deviate from safety-critical processes without approval.
Are you aware of any export control (ITAR/EAR) requirements on your current work? · Safety
Much of Nokturnal's defense and aerospace work involves export-controlled technology. ITAR and EAR apply to technical data, hardware and software. Export-controlled items are handled only in authorized systems and shared only with authorized people. Each contract's classification records whether it is ITAR or EAR controlled. The Export Compliance Policy, P-825-001, governs all export activity.
How do you prevent counterfeit parts from entering your supply chain? · Safety
Nokturnal follows the Counterfeit Control Plan, SOP-840-002. Suppliers that affect product quality come from the Approved Supplier List. Purchases of electronic parts from brokers need a counterfeit risk assessment (F-840-005). Parts must have traceability documentation: C of Cs, test reports and manufacturer certifications. Suspect parts are segregated and reported immediately.
What is Nokturnal's right-of-access policy for customers and regulators? · Safety
Nokturnal provides right of access for its customers, its customers' customers, and statutory and regulatory authorities to the applicable areas of all facilities, at any level of the supply chain, involved in the order and to all applicable records (QM-001 §7.4). Be cooperative and professional during customer or regulatory visits.
Internal Audit · SOP-920-001 · F-920-001
Audit Prep
What auditors look at for each process and what to have ready. Dates, auditors and the agenda for each audit come from the current internal audit plan.
Opening meeting
During the audit
Closing meeting
Have ready, by process (F-920-001 audit areas)
Leadership & Quality · Clauses 4, 5, 6, 7 (not 7.1.3–7.1.5), 9, 10
- QMS documents: the current Quality Manual and governing documents from the SharePoint Master Document Library (Document Map); be ready to explain the QMS scope and why all requirements apply
- Context (4): internal and external issues, interested parties (QM-001 §4.2), process interactions, SWOT & Process Analysis (F-610-001)
- Leadership (5): connect the Quality Policy, objectives, responsibilities and customer focus to current decisions
- Planning & improvement (6, 10): current risks (QMS › Quality Management › Risks › All Risks), quality objectives, improvement actions, NCR/CAPA evidence and effectiveness checks (Nonconformances, CAPA Actions)
- Support (7): competency (F-720-001), awareness (F-720-002), training records (eLearning), communication and document control
- Performance (9): KPI trends and targets (Home › KPI), customer feedback, prior audit status and Management Review inputs and actions (QMS › Quality Management › Reviews; agenda F-930-001)
Order Review & Planning · Clauses 8.1, 8.2
- A contract or order traced from review before acceptance: the F-820-001 contract review and F-820-002 classification in Odoo (Contract Classifications)
- Customer, statutory, regulatory and special requirements, and the flowdowns that carry them (Apply FAR and DFARS flowdowns)
- Records of requirement changes and how they were communicated to affected teams
- Program planning: the PMP (Governance › PMPs), risks, deliverables and configuration requirements
Purchasing · Clause 8.4
- The auditor will likely pick a purchased item or outside service and trace it from supplier selection through purchase, receipt, verification and supplier monitoring
- Supplier approval status, approved scope and qualification or re-evaluation evidence (QMS › Suppliers › Approved Supplier List)
- Quality clauses and project flowdowns on the purchase request in Odoo, and the purchase order the buyer placed in Odoo
- Receiving results and inspection against the order, drawing, C of C and acceptance requirements (QMS › Receiving › Inspections (Receiving))
- Supplier quality and OTD results (Home › KPI; Purchase › Reporting › Supplier On-Time Delivery) and actions for poor performance; supplier corrective actions
- Counterfeit-part prevention evidence where it applies (SOP-840-002, F-840-005)
Production · Clauses 7.1.3, 7.1.4, 7.1.5, 8.5, 8.6, 8.7
- The auditor will likely pick an active or recent build and trace how it was planned, performed, inspected, released and recorded
- The current manufacturing order, drawing, BOM and work instructions at the point of use
- Material, lot/serial, operator and configuration traceability in Odoo
- Calibrated tools and their status (QMS › Calibration › Devices); ESD and FOD controls
- In-process and final inspection evidence, First Article Inspection where required (FAI Records), and authorized product release
- Identification, segregation and disposition of nonconforming product (Nonconformances)
Design & Development · Clauses 8.3, 8.1.2, 8.1.4
- The auditor will likely pick one project or deliverable and trace it from approved requirements through design reviews, verification and validation, configuration control and release
- The design plan and release state: the PMP and the classification's section 4B (P-830-002)
- Traceability from requirements to controlled drawings, BOMs, software and acceptance criteria; V&V results in the DVP&R (F-830-003)
- Design review records (F-830-007 PDR Record, F-830-008 DR-PDR) with decisions, actions and authorization to proceed
- Configuration baselines and change control in Odoo PLM (ECRs) and GitLab, and CRB approval before ProdRel
- Product safety, critical item and key characteristic controls where they apply (PMP, classification, Critical Part flag); risks on the project
Be ready for your session
- Know your role and the process you perform
- Use the current controlled document from the Master Document Library
- Open live records in Odoo, GitLab or SharePoint/OneDrive; auditors want objective evidence, not presentations
- Be ready to trace one recent, real example
- Answer directly; if unsure, bring in the process owner
- Do not make duplicate or uncontrolled copies for the audit
SOP-851-001 Research Services · SOP-830-001 · F-820-002
Research Services
For projects where the deliverable is reports, data, analysis or documentation. These projects follow SOP-851-001 instead of the formal design controls of SOP-830-001.
SOP-851-001 Research Services applies to
- SBIR Phase I and Phase II feasibility studies and research
- STTR collaborative research programs
- Basic and exploratory research, trade studies and algorithm development
- Contracts where the primary deliverable is reports, analysis or documentation
- Research and development up to TRL 6 (prototype demonstration in a relevant environment)
SOP-830-001 Design & Development Control applies to
- Production contracts
- Deliverable hardware or software products for operational deployment (TRL 7+)
- Safety-critical development
- Any contract where classification section 4 (Design Control) is YES
Technology Readiness Level (TRL) boundary
| TRL | Maturity | Usually governed by |
|---|---|---|
| 1 | Basic principles observed | SOP-851-001 Research Services |
| 2 | Technology concept formulated | SOP-851-001 Research Services |
| 3 | Experimental proof of concept | SOP-851-001 Research Services |
| 4 | Validated in lab environment | SOP-851-001 Research Services |
| 5 | Validated in relevant environment | SOP-851-001 Research Services |
| 6 | Prototype demo in relevant environment | SOP-851-001 Research Services |
| 7 | Prototype demo in operational environment | SOP-830-001 Design & Development |
| 8 | System complete and qualified | SOP-830-001 Design & Development |
| 9 | System proven in operations | SOP-830-001 Design & Development |
TRL 1–6: SOP-851-001 generally applies. Beyond TRL 6 toward operational deployment: SOP-830-001 generally applies (SOP-851-001 §3). TRL is a guide; the contract classification is the decision.
What SOP-851-001 requires
Initiation (§6.1, Program Manager)
- Establish the project in Odoo Project
- Create a project folder in OneDrive
- Communicate project objectives and the deliverable schedule to the research team
Execution (§6.2)
- Iterate, experiment and adapt methods as the work progresses
- Keep records sufficient to recreate the work and substantiate conclusions; format is the researcher's choice (lab notebooks, memos, annotated code)
- Keep the Program Manager informed; submit customer reports per the contract schedule
- Document negative results: what was tried, why it did not succeed, lessons learned
Closeout (§6.4)
- Submit final deliverables and obtain customer acceptance
- Organize project files in OneDrive for future access
- Hold a brief lessons learned discussion with the team (record it with Governance › Lessons Learned)
- Close the project in Odoo
Records for a Research Services project
| Record | Where | Why the auditor cares |
|---|---|---|
| Contract Classification | Odoo, Governance › Contract Classifications, section 3 Research Services | The decision that SOP-851-001 applies. Lead with it. |
| Contract Review | Odoo, Contract Review on the project (F-820-001) | Requirements reviewed before acceptance |
| Contract and customer correspondence | OneDrive project folder (§7) | The requirements baseline for research work |
| Submitted deliverables | OneDrive project folder (§7) | Reports, data and analysis traceable to the contract |
| Technical work products | OneDrive project folder (§7) | Data, code, analysis and notes that support the conclusions |
| Customer acceptance | OneDrive project folder | Email or signed acceptance of each deliverable (§6.4) |
| Project record | Odoo Project | Status, team and deliverable tracking from start to close |
| Negative results and lessons learned | OneDrive project folder; Odoo Lessons Learned | SOP-851-001 requires them (§6.2, §6.4) |
Likely auditor questions
This project has no BOM, no drawings and no DVP&R. Where are your design controls? · Research
The contract classification put this project under SOP-851-001 Research Services because the primary deliverable is reports and analysis, not a product for operational deployment. Formal clause 8.3 design controls are not required for this scope; SOP-851-001 has its own required elements, shown above.
How do you make sure research deliverables meet the customer's requirements? · Research
The contract is reviewed before acceptance and kept in the OneDrive project folder. Deliverables are provided per the contract and Program Management Plan (§6.3), and customer acceptance is kept. The Program Manager owns the customer relationship and makes sure deliverables meet contract requirements.
How do you handle negative results or failed approaches? · Research
SOP-851-001 treats them as valuable knowledge: document what was attempted, why it did not succeed and the lessons learned, and keep it with the project files.
How do you know when a research project needs formal design controls? · Research
SOP-851-001 does not apply to production contracts, deliverable hardware or software for operational deployment (TRL 7+), or safety-critical development. When the scope changes, the contract is re-classified in Odoo (Start Review reopens the classification) and SOP-830-001 applies if section 4 becomes YES. Classifications are also reviewed on the Review Schedule.
Does research documentation have to follow a template? · Research
No. The format is at the researcher's discretion (lab notebooks, technical memos, annotated code or other formats) as long as the records are sufficient to recreate the work and substantiate the conclusions.
Who is responsible for quality on research projects? · Research
The Program Manager owns execution and the customer relationship. The research team does the technical work and keeps the documentation. Quality provides oversight for regulatory compliance and steps in only when compliance issues arise (SOP-851-001 §5).
Do
- Lead with the contract classification; it justifies everything that follows
- Show the OneDrive folder: contract, deliverables, technical work products
- Show customer acceptance of deliverables (email is fine)
- Know your TRL and whether the work is research (≤ TRL 6) or heading to deployment
- Show documented negative results and lessons learned
- Name SOP-851-001 and explain it exists for this kind of work
Don't
- Apologize for having no DVP&R or BOM; SOP-851-001 does not require them
- Say "we don't track this project"; SOP-851-001 requires an Odoo project and a OneDrive folder
- Be unable to show customer acceptance of delivered reports
- Claim research scope after the work has moved to TRL 7+ deployment without re-classifying
- Confuse "no formal design controls" with "no controls at all"
Process Ownership Reference
Who Manages What?
Search by area, role or procedure to find who owns a QMS process. Roles are the ones named in each procedure.
Design & Development
SOP-830-001 · P-830-001 · P-830-002
- Senior Owner
- Vice President of Operations (P-830-001) Primary
- Design Authority
- Project Lead (assigned per program) Lead
- Oversight
- Quality/Compliance Manager Support
- Approvals
- Senior Leadership Team Major Decisions
Customer Related Processes
SOP-820-001
- Senior Owner
- VP of Business Development Primary
- Final Authority
- Executive Vice President or designee Approver
- Compliance
- Contract and Compliance Specialist Support
- Technical
- Program Managers Interface
Purchasing & Supplier Management
SOP-840-001 · SOP-840-002
- Primary
- Contract and Compliance Specialist (supplier approval) Primary
- Purchasing
- Office Support – Purchaser Execute
- Inspection
- Production / Manufacturing Technician Verify
- Periodic Review
- Top Management Mgmt Review
Production & Service Provision
SOP-850-001
- Product Conformity
- Program Managers Primary
- Operations
- Production and Supply Chain Manager Plan
- Inspection
- Quality Assurance Verify
- Execution
- Production personnel (engineers, technicians) Execute
Internal Audits
SOP-920-001 · F-920-001
- Scheduling
- Executive Vice President or designee Primary
- Execution
- Audit Coordinator (selected by management) Lead
- Audit Team
- Certified internal auditors (may be outsourced) Audit
- CA Review
- Top Management Review
Configuration Management
SOP-831-001 · F-731-001
- Senior Owner
- Vice President of Operations (part numbering & lifecycle) Primary
- Board
- Configuration Review Board (CRB) · CCB Approve
- Compliance
- Quality / Compliance Support
- Documents
- Engineering Create
Risk Management
SOP-610-001 · F-610-001
- Senior Owner
- Executive Management Primary
- Strategic
- Leadership team (SWOT & Process Analysis) SWOT
- Programs
- Program Managers (SOP-820-002 §6.4) Projects
Program Management
SOP-820-002
- Process Owner
- Program Managers Primary
- Assigns PM
- Vice President of Operations Senior
- Plan Approval
- CEO (programs >$1M, >2 years or SBIR Phase III) Approve
Order Review & Planning
F-820-001 · F-820-002 · Core Process 1
- Acceptance
- Executive Vice President or designee Primary
- Technical
- Program Managers Execute
- Contracts
- Contract and Compliance Specialist Review
- Risk Above Medium
- President Accept
Research & Development
SOP-851-001 · Core Process 2
- Execution
- Program Manager Primary
- Research
- Research Team Execute
- Oversight
- Quality (regulatory compliance) Support
- Research Lead
- CEO (Chris Holmes Parker; P-830-001) Strategy
Control of Nonconforming Product
SOP-870-001 · WI-870-001
- Disposition
- Management (Quality Assurance per SOP-850-001) Primary
- Customer
- Program Manager (concessions, post-delivery) Contact
- Escapes
- CEO or designee Notify
- Reporting
- Any employee Identify
Continual Improvement & Corrective Action
SOP-1000-001
- Tracking
- Vice President of Operations (assigns investigator, due date) Primary
- Initiation
- All employees Raise
Documented Information
SOP-750-001 · F-750-001
- Master List
- Vice President of Operations or designee Primary
- Approval
- Management, for its own area Approver
- Storage
- IT & Cybersecurity Manager (Giovonni Alfaro; cloud storage) Support
Product Safety
SOP-814-001
- Accountable
- CEO Primary
- Coordinates
- Product Safety Representative (PSR) Lead
- Programs
- Program Managers (Safety Risk Assessments) Execute
Export Compliance
P-825-001
- Program Owner
- Empowered Official Primary
- Day-to-Day
- Export Compliance Administrator Operate
- Programs
- Program / Project Managers Flow down
Finance & Resource Allocation
P-500-005
- Process Owner
- Chief Financial Officer (Ilana Gat) Primary
- Co-Owner
- Program Managers Budget
No matching areas found. Try a role name, SOP number, or process keyword.
The individual(s) responsible for coordinating product safety activities: facilitating safety assessments, liaising with customers on safety matters, monitoring regulatory changes and reporting safety issues to management. The role may be assigned to the CEO, the Quality Manager or a designated Program Engineer (SOP-814-001 §3).
Ownership by Role
Senior Management Ownership Summary
| Role | QMS Areas Owned / Led | Key Procedures |
|---|---|---|
| CEO (Chris Holmes Parker) | Quality Manual ApprovalResearch InitiativesProduct SafetyExternal CommunicationsCustomer EscapesHigh & Extreme Program Risks | QM-001, P-830-001, SOP-814-001, SOP-820-002 |
| Vice President of Operations | Design & DevelopmentConfiguration ManagementPM AssignmentCorrective Action TrackingMaster Document List | P-830-001, SOP-831-001, SOP-820-002, SOP-1000-001, SOP-750-001 |
| Executive Vice President | Internal Audit ScheduleOrder AcceptanceContract Final Authority | SOP-920-001, SOP-820-001 |
| Chief Financial Officer (Ilana Gat) | Finance & ResourcesBudget AllocationFinancial Risk | P-500-005 |
| VP of Business Development | Customer EngagementProposals & OrdersRequirements Determination | SOP-820-001 |
| Quality Manager | Design Control OversightContract Classification ApprovalQMS DocumentsQuality Oversight | SOP-830-001, F-820-002, SOP-851-001 |
| Contract and Compliance Specialist (Management Representative) | QMS ConformanceSupplier Approval / ASLCounterfeit PreventionContract ComplianceCustomer Satisfaction Metrics | QM-001, SOP-840-001, SOP-840-002, SOP-820-001 |
| Program Managers (assigned per program) | Program ManagementProduct ConformityCustomer CommunicationResearch ProjectsProgram Risks & Safety Assessments | SOP-820-002, SOP-850-001, SOP-851-001, SOP-814-001 |
Quick Reference
Acronym Glossary
Definitions for terms and abbreviations used across Nokturnal's Quality Management System.
| Term | Stands for | Area | Definition |
|---|---|---|---|
| 3TG | Tantalum, Tin, Tungsten & Gold | Compliance | The four "conflict minerals" regulated under the Dodd-Frank Act. Nokturnal.AI provides written certification on 3TG content when customers require it (QM-001 §4.2). |
| AS9100 | Aerospace Quality Management Standard | Quality System | The quality management standard for aviation, space and defense organizations. Nokturnal's QMS is built to meet it (QM-001). |
| ASL | Approved Supplier List | Procurement | The list of suppliers approved to supply Nokturnal. Kept in Odoo at QMS › Suppliers › Approved Supplier List. |
| BOM | Bill of Materials | Procurement | A structured list of all components, sub-assemblies and raw materials needed to build a product, with quantities and part numbers. An eBOM is the engineering BOM used in ProtoRel. |
| CAPA / CAR | Corrective and Preventive Action / Corrective Action Request | Quality System | The record used to find a problem's root cause and fix it so it does not recur (SOP-1000-001). Tracked in Odoo at QMS › Nonconformance › CAPA Actions. |
| CCB | Change Control Board | Quality System | Approves Class I changes to released parts and moves parts to Obsolete (F-731-001, SOP-831-001). |
| CDR | Critical Design Review | Design Review | A formal review held mid-EngRel that establishes the design baseline. Follows PDR (P-830-002). |
| CRB | Configuration Review Board | Quality System | The board whose unanimous approval moves a part from Confirmed to Released, and which must approve the EngRel → ProdRel transition (F-731-001, P-830-002). |
| DVP&R | Design Verification and Validation Plan & Report | Design Review | The workbook (F-830-003) that records how each design requirement is verified and validated, and the results (SOP-830-001). |
| EAR | Export Administration Regulations | Compliance | U.S. regulations controlling the export of commercial and dual-use goods and technology (P-825-001). |
| ECO | Engineering Change Order | Quality System | The authorization to implement an approved design or documentation change. Worked in Odoo at QMS › Change Management. |
| ECP | Engineering Change Proposal | Quality System | A proposal to change a contract deliverable, submitted to the customer for approval before implementation. |
| ECR | Engineering Change Request | Quality System | A request to change a design or document. It is reviewed first and, when approved, implemented through an ECO. |
| EngRel | Engineering Release | Design Review | The release state for a repeatable engineering baseline: versioned drawings, released Normal BOM and basic work instructions (P-830-002). Shown in Odoo as EngREL. |
| FAI | First Article Inspection | Production | Inspection of the first production item to show the process can produce conforming product (AS9102). Recorded in Odoo under QMS › Manufacturing › First Article Inspection. |
| FIFO | First In, First Out | Production | An inventory method where the oldest stock is used first. |
| ICD | Interface Control Document | Design Review | A document defining the physical and functional interfaces between systems or subsystems. Changes to ICDs always need documented review and approval (P-830-002). |
| IP | Intellectual Property | Compliance | Patents, trade secrets, proprietary designs and technical data owned by Nokturnal or its customers. Must be protected per company policy and contract requirements. |
| ITAR | International Traffic in Arms Regulations | Compliance | U.S. regulations controlling the export of defense articles, services and technical data (P-825-001). |
| KC | Key Characteristic | Design Review | An attribute or feature whose variation significantly affects product fit, performance, service life or manufacturability (SOP-814-001). |
| KPI | Key Performance Indicator | Quality System | A measure of a quality objective (F-520-001). Shown in Odoo at Home › KPI. |
| NCR | Nonconformance Report | Quality System | A record of a product, service or process that does not meet a requirement. Raised in Odoo at QMS › Nonconformance and tracked to closure. |
| NPD | New Product Development | Design Review | Taking a product from concept through design, verification, validation and release to production. |
| OER | Objective Evidence Record | Quality System | The internal audit form (F-920-003) where auditors record evidence and nonconformances. |
| OFI | Opportunity for Improvement | Quality System | An audit observation that is not a nonconformance but could improve the process (SOP-920-001). |
| OTD | On Time Delivery | Procurement | The share of deliveries made on or before the committed date. Targets: ≥ 90% to customers and ≥ 90% from suppliers (F-520-001). |
| PAC | Product Acceptance by Customer | Production | The rate at which customers accept delivered products without rejection. Target: ≥ 95% (F-520-001). |
| PDR | Preliminary Design Review | Design Review | An early review of the design concept against requirements. ProtoRel moves to EngRel at PDR completion (P-830-002). Record: F-830-007. |
| PMP | Program Management Plan | Design Review | The program's plan (F-820-004 template), kept in Odoo at Programs & Projects › Program Control › Governance › PMPs. |
| PO / PR | Purchase Order / Purchase Request | Procurement | The purchase request starts in Odoo with its quality clauses and flowdowns; after approval the buyer places the purchase order in Odoo (SOP-840-001). |
| ProdRel | Production Release | Design Review | The release state for production: final BOM, drawings and work instructions, with formal ECR/ECO/CCB change control (P-830-002). Shown in Odoo as ProdREL. |
| ProtoRel | Prototype Release | Design Review | The release state for R&D and first builds: eBOM, iterative change control (P-830-002). Shown in Odoo as ProtoREL. |
| PSR | Product Safety Representative | Quality System | The individual(s) who coordinate product safety activities; may be the CEO, the Quality Manager or a designated Program Engineer (SOP-814-001). |
| QMS | Quality Management System | Quality System | The policies, processes, procedures and records that define how Nokturnal ensures product quality and continual improvement, built to AS9100. |
| REACH | Registration, Evaluation, Authorisation & Restriction of Chemicals | Compliance | EU regulation controlling hazardous substances in products. Nokturnal informs customers of restricted substances when required. |
| RFQ | Request for Quotation | Procurement | A request to suppliers for price and lead time on parts or services. |
| RoHS | Restriction of Hazardous Substances | Compliance | EU directive limiting specific hazardous materials (e.g. lead, mercury, cadmium) in electronic products, where it applies. |
| SBIR / STTR | Small Business Innovation Research / Small Business Technology Transfer | Procurement | Federal programs funding early-stage R&D; STTR requires collaboration with a research institution (SOP-851-001). |
| SOP | Standard Operating Procedure | Quality System | A controlled procedure. The controlled copy lives in the SharePoint Master Document Library and is indexed in Odoo's Document Map; always use the current revision. |
| SOW | Statement of Work | Procurement | The contract document defining the tasks, deliverables, schedule and standards a contractor must meet. |
| SRA | Safety Risk Assessment | Quality System | A systematic process to identify hazards, assess risks and set mitigations (SOP-814-001). |
| SWOT | Strengths, Weaknesses, Opportunities & Threats | Compliance | The analysis leadership uses with F-610-001 to assess risks and opportunities (SOP-610-001). |
| TRL | Technology Readiness Level | Design Review | A 1–9 scale of technology maturity. Research Services typically apply through TRL 6 (SOP-851-001). |
| TRR | Test Readiness Review | Design Review | A review confirming the product and test setup are ready for formal testing. EngRel → ProdRel follows CDR and TRR plus CRB approval (P-830-002). |
| WIP | Work In Progress | Production | Products or assemblies that have started the build but are not yet completed and accepted. Identification and traceability apply to WIP too. |
No matching acronyms found. Try a different keyword.