Quality Objectives & KPI's

Product Acceptance by Customer ≥ 95%
On Time Delivery ≥ 90%
Time from Delivery Order or Contract receipt to Entry ≥ 95% within 5 business days
Supplier Quality ≥ 90%
Supplier OTD ≥ 90%
Commercial Customer Satisfaction Score ≥ 3.5 or 70%
Where the numbers live: current results and 12-month trends are on the KPI dashboard in Odoo, Home › KPI (KPI Dashboard group; members of Weekly Executive Report and QMS Manager have it automatically). Contract entry is measured there as at most 5 business days after award. The Quality Manual, QM-001 §6.2 and §9.1, says these objectives are how the QMS is measured.

"We are intelligent, adaptive, and integrated."

Mission statement, F-520-001

Mission

We are intelligent, adaptive, and integrated. Our mission is to design and rapidly deliver mission-ready technologies with uncompromising quality, safety, and reliability. With speed, integrity, and precision, we shape the future of technology and empower warfighters, scientists, and engineers through solutions that exceed expectations and ensure mission success.

Vision

To be the definitive source for impact-driven defense, aerospace, and environmental sensing technologies, delivering breakthrough innovations in a fraction of traditional timelines while building an unmatched reputation for operational excellence that measurably advances our industries and empowers our customers' most critical missions.

Service + Leadership

We put the warfighter first in every decision and lift each other up with humility, responsibility, and strength.

Resilience + Accountability

We step up when it matters most, go the extra mile even in adversity, and count on each other to deliver when the stakes are highest.

Innovation + Agility

We think outside the box, challenge traditional methods, and leverage our agility to rapidly deliver cutting-edge solutions to complex problems.

QMS Documentation Hierarchy · QM-001

  1. Quality Manual (Level 1)
  2. Policies (Level 2)
  3. Procedures (Level 3)
  4. Work Instructions (Level 4)
  5. Forms & Records (Level 5)

Employee Roles

How You Contribute

Every person at Nokturnal plays a part in maintaining our QMS. Click a role to see its quality responsibilities. Role names are the ones the Quality Manual and procedures use.

Quality is everyone's responsibility. The QMS only works when every team member actively upholds their role. Everyone is trained on the quality policy, the objectives, their contribution to the QMS and what happens when requirements are not met within their first 90 days (QM-001 §7.3).
Senior Leadership — CEO and executive team · QM-001 §5
  • Set the Quality Policy, objectives, mission, vision and values, and keep them communicated
  • Run SWOT & Process Analysis (F-610-001) and act on risks and opportunities per SOP-610-001
  • Hold Management Review (F-930-001 agenda) and all-hands meetings
  • Provide the resources the QMS needs
  • Make sure product safety and configuration management requirements are built into the processes
  • The CEO or designee notifies customers within 2 business days of any escape (QM-001 §7.4)
Vice President of Operations — Operations leadership · P-830-001 §3
  • Oversee product development and establish technical direction
  • Ensure compliance with standards and report development progress to executive management and the Board
  • Ensure the product development lifecycle methodology is documented and followed
  • Oversee configuration management, part numbering and lifecycle management (SOP-831-001)
  • Ensure product safety processes are implemented throughout the product lifecycle
  • Assign an investigator and due date to corrective action requests and track them (SOP-1000-001)
Department Managers — Mid-Level Leadership
  • Approve controlled documents for your area and assign authors (SOP-750-001)
  • Support QMS and regulatory compliance within your department
  • Attend internal audit opening and closing meetings and follow up corrective actions (SOP-920-001)
  • Disposition nonconforming product within your authority (SOP-870-001)
  • Ensure processes are delivering intended outputs
  • Ensure QMS integrity is maintained when changes are planned
All Employees — Every Team Member
  • Complete your assigned training on time (Take an eLearning course)
  • Report suspected violations in good faith; retaliation is prohibited (P-730-001)
  • Raise an NCR in Odoo when you find a nonconformance (SOP-1000-001, Raise and find an NCR)
  • Use only the current controlled version of a document; printed copies are uncontrolled
  • Protect proprietary and export-controlled information
  • Follow the documented procedures and work instructions for your role
  • Maintain identification and traceability of product at all times, including work in progress
Management Representative — Contract and Compliance Specialist · QM-001 §5.3
  • Oversee QMS conformance to AS9100 requirements
  • Ensure processes are delivering intended outputs across the organization
  • Report on QMS performance and opportunities for improvement
  • Has organizational freedom and unrestricted access to Senior Leadership to resolve quality matters
  • Promote customer focus throughout the company
  • Prevent falsification of data
  • May act as liaison with external parties on QMS matters

Key Quality Activities

Internal Audits

Conducted per SOP-920-001 against the F-920-001 schedule; every process is audited at least once a year. Any employee may be interviewed or asked for records. See the Audit Prep tab.

Nonconformance Reporting

Raised and tracked in Odoo, QMS › Nonconformance › Nonconformances, and resolved through corrective action per SOP-870-001, SOP-1000-001 and WI-870-001.

Continual Improvement

All employees contribute ideas. Improvement actions are tracked in the QMS module in Odoo (QMS › Nonconformance › CAPA Actions) and reviewed at Management Review (QM-001 §10).

Department Quality Roles

My Department

Select your department to see how your team contributes to the QMS, which objectives you affect, and where the work is done.

Engineering

Design · Development · Verification

Engineering teams own the technical quality of Nokturnal's products. From requirements capture through design reviews, verification and validation, and configuration control, engineering carries AS9100 design and development compliance.

≥95% · Product Acceptance by CustomerPDR / CDR / TRR · Key Design Gates

Design & Development

  • Execute assigned technical tasks per program requirements and SOW
  • Maintain design outputs that meet functional and performance requirements
  • Take part in design reviews (PDR, CDR, TRR) with recorded evidence (F-830-007 PDR Record, F-830-008 DR-PDR template)
  • Make sure design inputs (requirements) are specified and traceable
  • Record verification and validation results in the DVP&R workbook, F-830-003

Configuration Management

  • Control drawings and documentation per SOP-831-001 and F-731-001
  • Raise an ECR in Odoo (QMS › Change Management › Engineering Change Requests) for changes that need formal control (P-830-002; course)
  • Keep BOMs right in Odoo: eBOM in ProtoRel, released Normal BOM in EngRel (P-830-002)
  • Make sure released drawings are at the correct revision and authorized
  • Tick Critical Part on a part record when it is a critical item per the program quality plan or drawing (WI-831-001)

Product Safety

  • Report any identified or suspected safety hazard immediately
  • Follow all safety-related procedures and work instructions
  • Do not deviate from safety-critical processes without approval
  • Know the critical items relevant to your work area
  • Take part in Safety Risk Assessments when asked (SOP-814-001)

Records & Reporting

  • Report progress in Odoo Project and enter your hours on your weekly timecard, Home › Timecards (Fill in and certify your weekly timecard)
  • Keep design specifications, test reports and source code in the controlled locations (GitLab repositories are linked to Odoo projects)
  • Keep design review records and V&V reports
  • Deliver work products on schedule with complete documentation
Key Procedures: SOP-830-001 Design & Development Control · P-830-002 Release State Control · SOP-831-001 Configuration Management · SOP-814-001 Product Safety · SOP-830-003 Software Development Standards

Program Management

Planning · Execution · Customer Interface

Program Managers carry quality on every contract: contract review and classification, gate planning, risk management, customer communication, and making sure deliverables meet requirements before they ship.

≥90% · On Time Delivery≥95% · Product Acceptance

Contract & Gate Planning

Risk & Issue Management

  • Keep program risks on the project in Odoo: Risks button, or Programs & Projects › Risks › My Projects' Risks (course)
  • Lead Safety Risk Assessments for assigned programs (SOP-814-001); record them as risks with the Safety category
  • Record on the PMP whether the program has critical items or key characteristics, with a link to the list
  • Make sure safety features are incorporated into designs
  • Escalate high and extreme risks to the CEO (SOP-820-002 §6.4.3)

Customer Communication

  • Act as primary customer interface for technical and programmatic matters
  • Contact the customer when nonconforming product is found after delivery, and for concessions on use-as-is or repaired product (SOP-870-001)
  • Confirm and document customer requirements before committing to supply
  • Tell customers about planned changes that could affect product quality before they take effect (QM-001 §7.4)
  • Get feedback from the customer and pass it on (SOP-820-001 §2.5)

Delivery Quality

Key Procedures: SOP-820-001 Customer Related Processes · SOP-820-002 Program Management · F-820-001 Contract Review Form · F-820-002 Contract Classification Form · SOP-610-001 Risk Management

Production & Integration

Build · Inspect · Deliver

Production is where quality becomes physical. Every build, inspection and delivery tests Nokturnal's quality commitments. Traceability, work instructions and nonconformance control are critical here.

≥95% · Product Acceptance≥90% · On Time Delivery

Build & Traceability

  • Follow work instructions and kit lists per the Production Core Process Diagram
  • Maintain identification and traceability of product at all times, including WIP
  • Work manufacturing orders and work orders in Odoo (Work a manufacturing job on the shop floor)
  • Verify the BOM before starting a production build
  • Protect customer-furnished property; report any loss or damage immediately

Inspection & Acceptance

  • Perform incoming inspection against the purchase order and drawings (WI-860-002; Receive and inspect purchased parts)
  • Verify identification, quantity and condition of received items in Odoo
  • Review certificates of conformance and test reports from suppliers
  • Perform in-process and final inspection and record results (SOP-850-001, WI-860-001)
  • Run a First Article Inspection when one is required (course)

Nonconformance Control

Material, Tools & Storage

  • Handle and store materials to prevent damage or deterioration
  • Keep material identified in the stock area at all times
  • Use only calibrated measuring tools (QMS › Calibration › Devices; course)
  • Keep materials traceable to their C of Cs and test reports
Key Procedures: SOP-850-001 Production and Service · SOP-870-001 Control of Nonconforming Product · SOP-854-002 Shipping and Receiving · SOP-840-001 Purchasing (verification) · SOP-831-001 Configuration Management

Quality, Contracts & Compliance

QMS Oversight · Contracts · Export Control

These duties belong to the Management Representative (the Contract and Compliance Specialist, QM-001 §5.3) and the Quality Manager role named in the procedures. It owns supplier evaluation, contract compliance review, QMS oversight and audit coordination.

≥95% · Contract Entry ≤5 Business Days≥90% · Supplier Quality

QMS Oversight

  • Keep unrestricted access to Senior Leadership on quality matters
  • Oversee QMS conformance to AS9100 across all departments
  • Support the Executive Vice President or designee with the internal audit schedule (F-920-001, SOP-920-001)
  • Drive corrective actions from audit findings to closure in Odoo (QMS › Quality Management › Audits; course)
  • Quality Manager approval of contract classifications (F-820-002 section 9)

Supplier Quality

  • Evaluate and approve suppliers before they supply materials (SOP-840-001 §2.1)
  • Keep the Approved Supplier List in Odoo: QMS › Suppliers › Approved Supplier List (course)
  • Summarize supplier nonconformances for Management Review
  • Issue and track Supplier Quality Reports (F-840-002)
  • Make sure the right quality clauses (F-840-004) are flowed down on purchases

Contract Compliance

  • Conduct export control review and classification (SOP-820-001 §2.4) under the Export Compliance Policy, P-825-001
  • Review contract terms for compliance and make sure requirements are flowed down
  • Verify contract review completeness
  • Monitor customer satisfaction metrics and facilitate customer corrective action responses
  • Coordinate customer notifications on regulatory and safety matters

Contract Administration

  • Make sure a new contract or delivery order is entered within 5 business days of receipt (quality objective, F-520-001)
  • Review and document compliance requirements before contract execution
  • Provide conflict mineral (3TG) certifications when customers require them
  • Manage REACH/RoHS declarations when applicable
Key Procedures: SOP-820-001 Customer Related Processes · SOP-840-001 Purchasing · SOP-840-002 Counterfeit Control Plan · SOP-920-001 Internal Audit · P-825-001 Export Compliance · P-500-003 Legal and Compliance

Purchasing / Supply Chain

Procurement · Supplier Management · Receiving

Purchasing controls the front door of every product Nokturnal builds. Supplier qualification, purchase requirements and counterfeit part prevention are this team's critical quality contributions.

≥90% · Supplier Quality≥90% · Supplier OTD

Supplier Qualification

  • Buy only from suppliers on the Approved Supplier List when the material affects product or service quality
  • Have new suppliers complete the Supplier Survey Questionnaire (F-840-001)
  • Use customer-approved special process sources when required
  • Never use brokers for electronic parts without the counterfeit risk assessment (F-840-005)

Purchase Requirements

Receiving & Verification

  • Verify purchased product against the order before use or entry into stock
  • Check identification, quantity and condition of every order received
  • Obtain and review C of Cs, test reports and material certifications
  • Record the receipt in Odoo to show acceptance (Receive, move and find stock)
  • Quarantine suspect or nonconforming items; do not mix them with good stock

Counterfeit Prevention

  • Follow the Counterfeit Control Plan, SOP-840-002, for electronic parts
  • Screen broker buys with the Counterfeit Risk Assessment, F-840-005
  • Never accept parts without proper traceability documentation
  • Report suspected counterfeit parts immediately and keep them segregated
Key Procedures: SOP-840-001 Purchasing · P-840-001 Procurement Policy · SOP-840-002 Counterfeit Control Plan · F-840-001 Supplier Survey · F-840-004 Quality Clauses

Finance

Budget · Cost Tracking · Resource Allocation

Finance makes sure Nokturnal has the resources to meet its quality commitments. Finance keeps the books in QuickBooks and loads them into Odoo Accounting each month (Accounting › QuickBooks › Import). Cost tracking, budget support for quality activities and integrity in financial reporting are this department's quality contributions.

Resource Support

  • Make sure there are financial resources for product development and quality activities
  • Support program budget planning and resource allocation
  • Monitor the financial side of product development and improvements
  • Make sure quality investments support organizational objectives

Integrity & Compliance

  • Keep accurate financial records; never falsify cost or budget data
  • Support government contract financial reporting requirements
  • Hold monthly cost reviews with Program Managers (SOP-820-002 §6.2.1)
  • Support Management Review with financial performance data
Key Procedures: P-500-005 Finance and Accounting Policy · P-500-004 Operations Policy

Research & Development

Innovation · Feasibility · Technology Maturation

R&D work is either Research Services (reports and analysis are the deliverable, SOP-851-001) or design work in ProtoRel under SOP-830-001. The contract classification decides which. See the Research Services tab.

SOP-851-001 · Research ServicesProtoRel · Design work release state

Research Documentation

  • Keep records sufficient to recreate the work and substantiate conclusions (SOP-851-001 §6.2)
  • Document negative results: what was tried, why it did not work, lessons learned
  • Keep the OneDrive project folder current: contract, deliverables, technical work products
  • Support patent applications for novel innovations

ProtoRel Controls

  • Keep an eBOM in Odoo for each prototype, approved by the Engineering or Project Lead before the first build (P-830-002)
  • Iterate without formal ECR/ECO, except changes to customer requirements, safety-critical features or critical items, interfaces or regulatory requirements, which need documented review and approval
  • Keep informal build notes legible and retained; they are QMS records
  • Move to EngRel at PDR completion (P-830-002 §5)

Technology Transfer

  • Make the transition from research to product development (NPD) effective
  • Hand over knowledge, test data and documentation to engineering teams
  • Evaluate new technologies for competitive advantage and customer value
  • The CEO leads research initiatives and coordinates technology transfer (P-830-001 §3)

SBIR / STTR Programs

  • Make SBIR/STTR deliverables meet the contract's technical requirements
  • Re-classify the contract if the scope moves to deliverable hardware/software for deployment (TRL 7+)
  • Keep essential oversight of configuration, risk and technical compliance
  • Mature technologies toward transition readiness
Key Procedures: SOP-851-001 Research Services · SOP-830-001 Design & Development Control · P-830-001 Product Development Policy · P-830-002 Release State Control

P-730-001 Business Ethics · P-500-003 Legal and Compliance · P-825-001 Export Compliance

Ethics & Compliance

Nokturnal upholds high ethical standards through an active ethics and legal compliance program. Every employee has a personal responsibility to act with integrity in all situations.

Non-retaliation: Nokturnal prohibits retaliation against any employee who reports suspected violations in good faith or takes part in an investigation (P-730-001). Report ethical concerns to the Compliance Manager or the DoD Office of Inspector General hotline; quality concerns can also go to your manager or the Management Representative.

Ethics & Integrity

Report any potential conflict of interest in writing to the Compliance Manager. Deal fairly and lawfully; never collude with competitors. All personnel read and acknowledge the Business Ethics Policy every year.

Export Control

Comply with ITAR and EAR. The Empowered Official owns the Export Compliance Program; report red flags or suspected violations within 24 hours to the Empowered Official or Export Compliance Administrator (P-825-001).

Government Contracting

Every contract is reviewed for applicable compliance requirements before execution (F-820-001). Compliance evidence is kept as documented information.

Intellectual Property

Protect proprietary information, trade secrets and IP rights. Handle proprietary and export-controlled data only in authorized systems.

Employee Obligations

What You Must Do

  • Complete all required compliance training on time
  • Report suspected violations in good faith to the appropriate channel
  • Support QMS compliance activities within your role
  • Cooperate with investigations and internal audits
  • Handle data only within authorized systems

What You Must Never Do

  • Falsify data, records or quality documents, ever
  • Share export-controlled or proprietary information without authorization
  • Retaliate against anyone reporting a compliance concern
  • Bypass established quality processes or skip documentation
  • Ignore or conceal product nonconformances

Conflict Minerals

Under the Dodd-Frank Act, Nokturnal provides written certification on conflict minerals (3TG: tantalum, tin, tungsten, gold) when customers require it (QM-001 §4.2).

Environmental Compliance

Products shall not contain substances prohibited by applicable legislation (e.g. REACH, RoHS). Customers are informed of hazardous substances when appropriate.

Continual Awareness

The Compliance Manager provides ethics and compliance training and keeps the training records. Ethics policy compliance is assessed every year (P-730-001).

AS9100 Audit Preparation

Audit FAQ

Questions auditors ask employees during AS9100 walk-around interviews. Auditors assess awareness, not just paperwork.

How audits work at Nokturnal: auditors determine compliance by observation, interview and record review (SOP-920-001 §5.11). You may be asked any of these questions on the spot. It's okay to say "I don't know, but here's how I'd find out."
What is Nokturnal's quality policy? · Policy

Nokturnal.AI and its employees are committed to meeting customer and legal requirements in order to achieve customer satisfaction. We will always strive to provide quality products on time and continually improve our Quality Management System.

Tip: Be able to state it in your own words and know where to find it: F-520-001 Quality Policy, the Quality Manual and the first tab of this portal.
What are Nokturnal's quality objectives / KPIs? · Policy

Product Acceptance by Customer ≥ 95%, On Time Delivery ≥ 90%, contract or delivery order entered within 5 business days of receipt ≥ 95% of the time, Supplier Quality ≥ 90%, Supplier OTD ≥ 90%, and Commercial Customer Satisfaction Score ≥ 3.5.

Tip: You don't need every number, but know the objectives that apply to your role. Results are on the KPI dashboard, Home › KPI in Odoo (KPI Dashboard group).
How do you contribute to the QMS in your role? · Policy

Describe your daily quality activities: following work instructions, keeping records, reporting issues, taking part in reviews. Auditors want to see that you understand your personal connection to quality, not just that a policy exists.

Tip: Think about: what quality records do I create? What procedures do I follow? Who do I report problems to? Use the "My Department" tab to prepare.
What happens if you don't follow quality procedures? · Policy

Not conforming to QMS requirements can lead to nonconforming product reaching customers, regulatory violations, loss of certification, contract penalties or safety incidents. Internally it leads to a nonconformance and corrective action, and may lead to disciplinary action.

Tip: Show that you understand the "why": quality procedures protect customers, the company and you, especially on defense and aerospace programs.
Are you aware of any ongoing quality issues or corrective actions in your area? · Policy

Be honest. If there are open corrective actions or known issues, describe them and what is being done. Auditors know problems exist; they want to see the system resolving them.

Tip: Before the audit, check QMS › Nonconformance › Nonconformances and CAPA Actions in Odoo for open items in your area and know their status.
How do you know what procedures apply to your job? · Process

Applicable procedures are identified in your job description, the Core Process Diagrams in the Quality Manual and your onboarding training. Controlled documents live in the SharePoint Master Document Library and are indexed in Odoo at Forms & Documents › Documents › Document Map and on the intranet Policies / Procedures page. Changes are communicated through meetings, email, Teams and management updates (QM-001 §7.4).

Tip: Name a procedure you use regularly (e.g. "I follow SOP-850-001 for production builds" or "SOP-840-001 when I raise a purchase request"). Course: Submit forms and find policies and procedures.
How are design changes controlled? · Process

It depends on the release state (P-830-002). In ProtoRel, iterative changes are allowed without formal ECR/ECO, but changes to customer requirements, safety-critical features or critical items, interface control documents or regulatory requirements need documented review and approval first. In EngRel, changes are controlled with documented rationale, and changes affecting customer requirements, safety or interfaces need a formal ECR/ECO. In ProdRel, changes are exception-based and formally approved through ECR/ECO and the CCB (SOP-831-001). ECRs and ECOs are worked in Odoo, QMS › Change Management.

Tip: Know what release state your project is in and what change control applies. Course: Request, approve and release an engineering change.
Can you walk me through how a new contract gets reviewed and entered? · Process

Each function reviews a new contract or delivery order with the F-820-001 Contract Review Form, done in Odoo with Start Contract Review on the project. Technical, legal, export control, quality and finance requirements are identified and the risk is rated. If the risk is higher than Medium, the President must accept it. The contract is then classified with the F-820-002 Contract Classification Form at Programs & Projects › Program Control › Governance › Contract Classifications, which decides which QMS procedures apply. Contracts are entered within 5 business days of receipt.

Tip: In Programs or Contracts, be ready to open a completed review and classification in Odoo and walk through them. Course: Classify and review a new contract.
How do you verify that purchased product meets requirements before using it? · Process

Receiving checks the delivery against the purchase order for identification, quantity and condition, and reviews Certificates of Conformance, test reports and other required documents. Inspection is done when required. The receipt is recorded in Odoo to show acceptance. Items that fail are quarantined and not used.

Tip: Production and Purchasing staff: be able to show the receipt and inspection records in Odoo. Course: Receive and inspect purchased parts.
What is an internal audit and when was the last one in your area? · Process

Internal audits are conducted per SOP-920-001 to verify that the QMS conforms to AS9100, customer, statutory and regulatory requirements and our own procedures. Each process is audited at least once a year per the master schedule (F-920-001). Auditors record evidence on Objective Evidence Records (F-920-003); findings are tracked to closure in the QMS module in Odoo.

Tip: Know when your area was last audited and what findings came from it. Audits and their actions are in QMS › Quality Management › Audits (auditors and QMS managers). See the Audit Prep tab.
How long are quality records retained? · Records

Suppliers must keep records at least 10 years from shipment unless the order says otherwise (quality clause QC06, F-840-004). Nokturnal's own records are kept for the retention periods in the F-750-001 Master Document List & Control of Records Table in SharePoint (SOP-750-001 §7), or longer if a customer or regulation requires.

Tip: Know where your quality records are kept (Odoo, SharePoint/OneDrive, GitLab, physical files) and how to retrieve them quickly.
How do you ensure product traceability throughout the build process? · Records

Product identification and traceability is maintained at all times, including work in progress (QM-001 §8.5). Serial and lot numbers, manufacturing orders, kit lists and BOM revisions are tracked in Odoo, and materials trace back to their C of Cs, test reports and purchase orders.

Tip: Be able to pick up a part on the floor and trace it back to its purchase order and C of C. That's what auditors do.
Where are your work instructions / procedures stored and are they current? · Records

Documented information is controlled per SOP-750-001. The controlled documents live in the SharePoint Master Document Library and are indexed in Odoo at Forms & Documents › Documents › Document Map and on the intranet Policies / Procedures page, each with its current revision. Printed copies are uncontrolled. Always use the current approved version.

Tip: If an auditor sees a printed procedure on your desk, they'll ask if it's current. Know how to check its revision in the Document Map.
Can you show me the training records for your area? · Records

New hires get QMS awareness training (F-720-002) and a competency evaluation (F-720-001) within 90 days of hire (QM-001 §7.2, §7.3). Assigned courses and completions are kept in Odoo eLearning; your courses are on the intranet Courses page. HR maintains training records (SOP-720-006).

Tip: Know what training you have completed and what is due. Your own record is at Human Resources › Training › My Training History; managers see their team under My Team's Training. Course: Take an eLearning course.
What do you do if you discover a nonconforming product? · Nonconformance

Stop and segregate the item; do not use or ship it. Tag it to prevent use. Raise a nonconformance in Odoo per SOP-870-001 and tell your supervisor. Management decides the disposition: rework, scrap, return to supplier, or use as is / repair with customer concession.

Tip: The words auditors want to hear: segregate, tag, document, report. Never "just fix it" without recording it. Course: Raise and find an NCR.
What is a corrective action and when is one required? · Nonconformance

A corrective action eliminates the cause of a nonconformance that has occurred and prevents it recurring. Any employee who finds a nonconformance initiates a request in the Odoo QMS module (SOP-1000-001, WI-870-001). The Vice President of Operations assigns an investigator and due date where needed and tracks it; top management reviews corrective actions from internal audits (SOP-920-001). An action is closed only when it is verified effective.

Tip: Auditors want corrective actions to address root cause, not symptoms. Be ready to explain the difference.
What happens if a nonconforming product has already shipped to a customer? · Nonconformance

This is an "escape." The CEO or designee notifies the customer within 2 business days of discovery (QM-001 §7.4). The Program Manager contacts the customer, takes remedial action and investigates, and starts a corrective action in Odoo when appropriate (SOP-870-001 §5.2).

Tip: Know the 2-business-day notification rule.
How do you identify and control nonconforming material in your area? · Nonconformance

Nonconforming material is physically separated from good stock and tagged, or placed in a designated quarantine or scrap area (product to be scrapped is tagged or marked red). It is logged in Odoo as a nonconformance. No one may use, ship or incorporate it without a formal disposition.

Tip: Auditors often look for a quarantine area or red-tagged items. Know where yours is.
Are there any critical items or key characteristics on the product you work on? · Safety

A critical item is an item (function, part, software, characteristic or process) whose failure, absence or degradation could cause injury or death, loss or serious damage to a major end item, mission failure or significant environmental damage. A key characteristic is an attribute whose variation significantly affects fit, performance, service life or manufacturability (SOP-814-001 §4). Contract review asks whether they have been identified (F-820-001 items 18–19). In Odoo the program's Program Management Plan records Critical Items / Key Characteristics with a link to the list, the Contract Classification flags Key Characteristics as a special requirement, parts that are critical items carry the Critical Part box in PLM (WI-831-001), and inspection checkpoints can be classed Critical in the QMS checkpoint templates.

Tip: If you work on defense or aerospace products, be able to name a critical item or key characteristic on your current program, or say where the list is.
What would you do if you identified a potential product safety issue? · Safety

Report it immediately to your supervisor and the Program Manager. Do not continue work that could introduce or worsen a hazard. The Program Manager leads a Safety Risk Assessment (SOP-814-001), recorded as a risk on the project in Odoo with the Safety category, and high and extreme risks are escalated to the CEO (SOP-820-002 §6.4.3). Never deviate from safety-critical processes without approval.

Tip: The answer auditors want: stop, report, document. Reporting is expected and safe; retaliation is prohibited.
Are you aware of any export control (ITAR/EAR) requirements on your current work? · Safety

Much of Nokturnal's defense and aerospace work involves export-controlled technology. ITAR and EAR apply to technical data, hardware and software. Export-controlled items are handled only in authorized systems and shared only with authorized people. Each contract's classification records whether it is ITAR or EAR controlled. The Export Compliance Policy, P-825-001, governs all export activity.

Tip: If you're unsure whether something is export-controlled, ask the Empowered Official or the Export Compliance Administrator before sharing it. When in doubt, don't share it.
How do you prevent counterfeit parts from entering your supply chain? · Safety

Nokturnal follows the Counterfeit Control Plan, SOP-840-002. Suppliers that affect product quality come from the Approved Supplier List. Purchases of electronic parts from brokers need a counterfeit risk assessment (F-840-005). Parts must have traceability documentation: C of Cs, test reports and manufacturer certifications. Suspect parts are segregated and reported immediately.

Tip: Be able to explain that you buy from approved suppliers and verify documentation at receiving.
What is Nokturnal's right-of-access policy for customers and regulators? · Safety

Nokturnal provides right of access for its customers, its customers' customers, and statutory and regulatory authorities to the applicable areas of all facilities, at any level of the supply chain, involved in the order and to all applicable records (QM-001 §7.4). Be cooperative and professional during customer or regulatory visits.

Tip: If a customer or government auditor arrives, alert the Management Representative immediately. Do not refuse access or hide records.

Internal Audit · SOP-920-001 · F-920-001

Audit Prep

What auditors look at for each process and what to have ready. Dates, auditors and the agenda for each audit come from the current internal audit plan.

How it's scheduled: the Executive Vice President or designee keeps the master schedule, F-920-001 Internal Audit Program (Schedule), and every process is audited at least once a year (SOP-920-001 §5.4). Audits may be outsourced to a qualified vendor. The audit coordinator agrees the date with the manager of each process. Audits, findings and their actions are kept in Odoo at QMS › Quality Management › Audits (course: Run quality audits and see actions through to closure).

Opening meeting

Confirms scope, agenda, approach and contacts. A management staff person attends (SOP-920-001 §2.5); leadership, Quality, the audit coordinator and process owners are usually invited.

During the audit

Auditors follow the audit plan and record evidence on Objective Evidence Records (F-920-003). The plan can change as they follow the evidence; process owners may be recalled.

Closing meeting

All nonconformances and opportunities for improvement are explained. The lead auditor's report (F-920-002) follows; every finding needs root cause, corrective action and verified closure in Odoo.

Have ready, by process (F-920-001 audit areas)

Leadership & Quality · Clauses 4, 5, 6, 7 (not 7.1.3–7.1.5), 9, 10

  • QMS documents: the current Quality Manual and governing documents from the SharePoint Master Document Library (Document Map); be ready to explain the QMS scope and why all requirements apply
  • Context (4): internal and external issues, interested parties (QM-001 §4.2), process interactions, SWOT & Process Analysis (F-610-001)
  • Leadership (5): connect the Quality Policy, objectives, responsibilities and customer focus to current decisions
  • Planning & improvement (6, 10): current risks (QMS › Quality Management › Risks › All Risks), quality objectives, improvement actions, NCR/CAPA evidence and effectiveness checks (Nonconformances, CAPA Actions)
  • Support (7): competency (F-720-001), awareness (F-720-002), training records (eLearning), communication and document control
  • Performance (9): KPI trends and targets (Home › KPI), customer feedback, prior audit status and Management Review inputs and actions (QMS › Quality Management › Reviews; agenda F-930-001)

Order Review & Planning · Clauses 8.1, 8.2

  • A contract or order traced from review before acceptance: the F-820-001 contract review and F-820-002 classification in Odoo (Contract Classifications)
  • Customer, statutory, regulatory and special requirements, and the flowdowns that carry them (Apply FAR and DFARS flowdowns)
  • Records of requirement changes and how they were communicated to affected teams
  • Program planning: the PMP (Governance › PMPs), risks, deliverables and configuration requirements

Purchasing · Clause 8.4

  • The auditor will likely pick a purchased item or outside service and trace it from supplier selection through purchase, receipt, verification and supplier monitoring
  • Supplier approval status, approved scope and qualification or re-evaluation evidence (QMS › Suppliers › Approved Supplier List)
  • Quality clauses and project flowdowns on the purchase request in Odoo, and the purchase order the buyer placed in Odoo
  • Receiving results and inspection against the order, drawing, C of C and acceptance requirements (QMS › Receiving › Inspections (Receiving))
  • Supplier quality and OTD results (Home › KPI; Purchase › Reporting › Supplier On-Time Delivery) and actions for poor performance; supplier corrective actions
  • Counterfeit-part prevention evidence where it applies (SOP-840-002, F-840-005)

Production · Clauses 7.1.3, 7.1.4, 7.1.5, 8.5, 8.6, 8.7

  • The auditor will likely pick an active or recent build and trace how it was planned, performed, inspected, released and recorded
  • The current manufacturing order, drawing, BOM and work instructions at the point of use
  • Material, lot/serial, operator and configuration traceability in Odoo
  • Calibrated tools and their status (QMS › Calibration › Devices); ESD and FOD controls
  • In-process and final inspection evidence, First Article Inspection where required (FAI Records), and authorized product release
  • Identification, segregation and disposition of nonconforming product (Nonconformances)

Design & Development · Clauses 8.3, 8.1.2, 8.1.4

  • The auditor will likely pick one project or deliverable and trace it from approved requirements through design reviews, verification and validation, configuration control and release
  • The design plan and release state: the PMP and the classification's section 4B (P-830-002)
  • Traceability from requirements to controlled drawings, BOMs, software and acceptance criteria; V&V results in the DVP&R (F-830-003)
  • Design review records (F-830-007 PDR Record, F-830-008 DR-PDR) with decisions, actions and authorization to proceed
  • Configuration baselines and change control in Odoo PLM (ECRs) and GitLab, and CRB approval before ProdRel
  • Product safety, critical item and key characteristic controls where they apply (PMP, classification, Critical Part flag); risks on the project

Be ready for your session

  • Know your role and the process you perform
  • Use the current controlled document from the Master Document Library
  • Open live records in Odoo, GitLab or SharePoint/OneDrive; auditors want objective evidence, not presentations
  • Be ready to trace one recent, real example
  • Answer directly; if unsure, bring in the process owner
  • Do not make duplicate or uncontrolled copies for the audit

SOP-851-001 Research Services · SOP-830-001 · F-820-002

Research Services

For projects where the deliverable is reports, data, analysis or documentation. These projects follow SOP-851-001 instead of the formal design controls of SOP-830-001.

The contract classification decides. Clause 8.3 design controls do not automatically apply to every R&D project. The Contract Classification in Odoo (F-820-002, Governance › Contract Classifications) has a section 3. Research Services (SOP-851-001). If the auditor asks why a research contract has no DVP&R or released BOM, the answer is: "Because the contract classification put this project under SOP-851-001, not SOP-830-001." If the contract requires delivery of prototype hardware or software units to the customer, even for evaluation, the answer to section 3 is NO.

SOP-851-001 Research Services applies to

  • SBIR Phase I and Phase II feasibility studies and research
  • STTR collaborative research programs
  • Basic and exploratory research, trade studies and algorithm development
  • Contracts where the primary deliverable is reports, analysis or documentation
  • Research and development up to TRL 6 (prototype demonstration in a relevant environment)

SOP-830-001 Design & Development Control applies to

  • Production contracts
  • Deliverable hardware or software products for operational deployment (TRL 7+)
  • Safety-critical development
  • Any contract where classification section 4 (Design Control) is YES

Technology Readiness Level (TRL) boundary

TRLMaturityUsually governed by
1Basic principles observedSOP-851-001 Research Services
2Technology concept formulatedSOP-851-001 Research Services
3Experimental proof of conceptSOP-851-001 Research Services
4Validated in lab environmentSOP-851-001 Research Services
5Validated in relevant environmentSOP-851-001 Research Services
6Prototype demo in relevant environmentSOP-851-001 Research Services
7Prototype demo in operational environmentSOP-830-001 Design & Development
8System complete and qualifiedSOP-830-001 Design & Development
9System proven in operationsSOP-830-001 Design & Development

TRL 1–6: SOP-851-001 generally applies. Beyond TRL 6 toward operational deployment: SOP-830-001 generally applies (SOP-851-001 §3). TRL is a guide; the contract classification is the decision.

What SOP-851-001 requires

Initiation (§6.1, Program Manager)

  • Establish the project in Odoo Project
  • Create a project folder in OneDrive
  • Communicate project objectives and the deliverable schedule to the research team

Execution (§6.2)

  • Iterate, experiment and adapt methods as the work progresses
  • Keep records sufficient to recreate the work and substantiate conclusions; format is the researcher's choice (lab notebooks, memos, annotated code)
  • Keep the Program Manager informed; submit customer reports per the contract schedule
  • Document negative results: what was tried, why it did not succeed, lessons learned

Closeout (§6.4)

  • Submit final deliverables and obtain customer acceptance
  • Organize project files in OneDrive for future access
  • Hold a brief lessons learned discussion with the team (record it with Governance › Lessons Learned)
  • Close the project in Odoo

Records for a Research Services project

RecordWhereWhy the auditor cares
Contract ClassificationOdoo, Governance › Contract Classifications, section 3 Research ServicesThe decision that SOP-851-001 applies. Lead with it.
Contract ReviewOdoo, Contract Review on the project (F-820-001)Requirements reviewed before acceptance
Contract and customer correspondenceOneDrive project folder (§7)The requirements baseline for research work
Submitted deliverablesOneDrive project folder (§7)Reports, data and analysis traceable to the contract
Technical work productsOneDrive project folder (§7)Data, code, analysis and notes that support the conclusions
Customer acceptanceOneDrive project folderEmail or signed acceptance of each deliverable (§6.4)
Project recordOdoo ProjectStatus, team and deliverable tracking from start to close
Negative results and lessons learnedOneDrive project folder; Odoo Lessons LearnedSOP-851-001 requires them (§6.2, §6.4)

Likely auditor questions

This project has no BOM, no drawings and no DVP&R. Where are your design controls? · Research

The contract classification put this project under SOP-851-001 Research Services because the primary deliverable is reports and analysis, not a product for operational deployment. Formal clause 8.3 design controls are not required for this scope; SOP-851-001 has its own required elements, shown above.

How do you make sure research deliverables meet the customer's requirements? · Research

The contract is reviewed before acceptance and kept in the OneDrive project folder. Deliverables are provided per the contract and Program Management Plan (§6.3), and customer acceptance is kept. The Program Manager owns the customer relationship and makes sure deliverables meet contract requirements.

How do you handle negative results or failed approaches? · Research

SOP-851-001 treats them as valuable knowledge: document what was attempted, why it did not succeed and the lessons learned, and keep it with the project files.

How do you know when a research project needs formal design controls? · Research

SOP-851-001 does not apply to production contracts, deliverable hardware or software for operational deployment (TRL 7+), or safety-critical development. When the scope changes, the contract is re-classified in Odoo (Start Review reopens the classification) and SOP-830-001 applies if section 4 becomes YES. Classifications are also reviewed on the Review Schedule.

Does research documentation have to follow a template? · Research

No. The format is at the researcher's discretion (lab notebooks, technical memos, annotated code or other formats) as long as the records are sufficient to recreate the work and substantiate the conclusions.

Who is responsible for quality on research projects? · Research

The Program Manager owns execution and the customer relationship. The research team does the technical work and keeps the documentation. Quality provides oversight for regulatory compliance and steps in only when compliance issues arise (SOP-851-001 §5).

Do

  • Lead with the contract classification; it justifies everything that follows
  • Show the OneDrive folder: contract, deliverables, technical work products
  • Show customer acceptance of deliverables (email is fine)
  • Know your TRL and whether the work is research (≤ TRL 6) or heading to deployment
  • Show documented negative results and lessons learned
  • Name SOP-851-001 and explain it exists for this kind of work

Don't

  • Apologize for having no DVP&R or BOM; SOP-851-001 does not require them
  • Say "we don't track this project"; SOP-851-001 requires an Odoo project and a OneDrive folder
  • Be unable to show customer acceptance of delivered reports
  • Claim research scope after the work has moved to TRL 7+ deployment without re-classifying
  • Confuse "no formal design controls" with "no controls at all"
Watch for scope creep. If a research contract grows to include deliverable hardware, software for deployment or safety-critical work, re-classify it and apply SOP-830-001. Auditors may probe whether a "research" project has quietly become product development.
Key documents: SOP-851-001 Research Services · F-820-002 Contract Classification Form · SOP-820-001 Customer Related Processes · SOP-820-002 Program Management · SOP-750-001 Control of Documented Information

Process Ownership Reference

Who Manages What?

Search by area, role or procedure to find who owns a QMS process. Roles are the ones named in each procedure.

Role names come from the procedures. Some procedure titles (Vice President of Operations, Executive Vice President, VP of Business Development, Contract and Compliance Specialist) are not current job titles. Several roles (including Quality Manager) have no matching job title in Odoo today; if you are not sure who holds a role, ask your manager or the CEO.

Design & Development

SOP-830-001 · P-830-001 · P-830-002

Senior Owner
Vice President of Operations (P-830-001) Primary
Design Authority
Project Lead (assigned per program) Lead
Oversight
Quality/Compliance Manager Support
Approvals
Senior Leadership Team Major Decisions

Customer Related Processes

SOP-820-001

Senior Owner
VP of Business Development Primary
Final Authority
Executive Vice President or designee Approver
Compliance
Contract and Compliance Specialist Support
Technical
Program Managers Interface

Purchasing & Supplier Management

SOP-840-001 · SOP-840-002

Primary
Contract and Compliance Specialist (supplier approval) Primary
Purchasing
Office Support – Purchaser Execute
Inspection
Production / Manufacturing Technician Verify
Periodic Review
Top Management Mgmt Review

Production & Service Provision

SOP-850-001

Product Conformity
Program Managers Primary
Operations
Production and Supply Chain Manager Plan
Inspection
Quality Assurance Verify
Execution
Production personnel (engineers, technicians) Execute

Internal Audits

SOP-920-001 · F-920-001

Scheduling
Executive Vice President or designee Primary
Execution
Audit Coordinator (selected by management) Lead
Audit Team
Certified internal auditors (may be outsourced) Audit
CA Review
Top Management Review

Configuration Management

SOP-831-001 · F-731-001

Senior Owner
Vice President of Operations (part numbering & lifecycle) Primary
Board
Configuration Review Board (CRB) · CCB Approve
Compliance
Quality / Compliance Support
Documents
Engineering Create

Risk Management

SOP-610-001 · F-610-001

Senior Owner
Executive Management Primary
Strategic
Leadership team (SWOT & Process Analysis) SWOT
Programs
Program Managers (SOP-820-002 §6.4) Projects

Program Management

SOP-820-002

Process Owner
Program Managers Primary
Assigns PM
Vice President of Operations Senior
Plan Approval
CEO (programs >$1M, >2 years or SBIR Phase III) Approve

Order Review & Planning

F-820-001 · F-820-002 · Core Process 1

Acceptance
Executive Vice President or designee Primary
Technical
Program Managers Execute
Contracts
Contract and Compliance Specialist Review
Risk Above Medium
President Accept

Research & Development

SOP-851-001 · Core Process 2

Execution
Program Manager Primary
Research
Research Team Execute
Oversight
Quality (regulatory compliance) Support
Research Lead
CEO (Chris Holmes Parker; P-830-001) Strategy

Control of Nonconforming Product

SOP-870-001 · WI-870-001

Disposition
Management (Quality Assurance per SOP-850-001) Primary
Customer
Program Manager (concessions, post-delivery) Contact
Escapes
CEO or designee Notify
Reporting
Any employee Identify

Continual Improvement & Corrective Action

SOP-1000-001

Tracking
Vice President of Operations (assigns investigator, due date) Primary
Initiation
All employees Raise

Documented Information

SOP-750-001 · F-750-001

Master List
Vice President of Operations or designee Primary
Approval
Management, for its own area Approver
Storage
IT & Cybersecurity Manager (Giovonni Alfaro; cloud storage) Support

Product Safety

SOP-814-001

Accountable
CEO Primary
Coordinates
Product Safety Representative (PSR) Lead
Programs
Program Managers (Safety Risk Assessments) Execute

Export Compliance

P-825-001

Program Owner
Empowered Official Primary
Day-to-Day
Export Compliance Administrator Operate
Programs
Program / Project Managers Flow down

Finance & Resource Allocation

P-500-005

Process Owner
Chief Financial Officer (Ilana Gat) Primary
Co-Owner
Program Managers Budget

No matching areas found. Try a role name, SOP number, or process keyword.

Product Safety Representative (PSR)

The individual(s) responsible for coordinating product safety activities: facilitating safety assessments, liaising with customers on safety matters, monitoring regulatory changes and reporting safety issues to management. The role may be assigned to the CEO, the Quality Manager or a designated Program Engineer (SOP-814-001 §3).

Ownership by Role

Senior Management Ownership Summary

RoleQMS Areas Owned / LedKey Procedures
CEO (Chris Holmes Parker)
Quality Manual ApprovalResearch InitiativesProduct SafetyExternal CommunicationsCustomer EscapesHigh & Extreme Program Risks
QM-001, P-830-001, SOP-814-001, SOP-820-002
Vice President of Operations
Design & DevelopmentConfiguration ManagementPM AssignmentCorrective Action TrackingMaster Document List
P-830-001, SOP-831-001, SOP-820-002, SOP-1000-001, SOP-750-001
Executive Vice President
Internal Audit ScheduleOrder AcceptanceContract Final Authority
SOP-920-001, SOP-820-001
Chief Financial Officer (Ilana Gat)
Finance & ResourcesBudget AllocationFinancial Risk
P-500-005
VP of Business Development
Customer EngagementProposals & OrdersRequirements Determination
SOP-820-001
Quality Manager
Design Control OversightContract Classification ApprovalQMS DocumentsQuality Oversight
SOP-830-001, F-820-002, SOP-851-001
Contract and Compliance Specialist (Management Representative)
QMS ConformanceSupplier Approval / ASLCounterfeit PreventionContract ComplianceCustomer Satisfaction Metrics
QM-001, SOP-840-001, SOP-840-002, SOP-820-001
Program Managers (assigned per program)
Program ManagementProduct ConformityCustomer CommunicationResearch ProjectsProgram Risks & Safety Assessments
SOP-820-002, SOP-850-001, SOP-851-001, SOP-814-001

Quick Reference

Acronym Glossary

Definitions for terms and abbreviations used across Nokturnal's Quality Management System.

New to Nokturnal? Bookmark this tab. Auditors and procedures use these abbreviations constantly.
TermStands forAreaDefinition
3TGTantalum, Tin, Tungsten & GoldComplianceThe four "conflict minerals" regulated under the Dodd-Frank Act. Nokturnal.AI provides written certification on 3TG content when customers require it (QM-001 §4.2).
AS9100Aerospace Quality Management StandardQuality SystemThe quality management standard for aviation, space and defense organizations. Nokturnal's QMS is built to meet it (QM-001).
ASLApproved Supplier ListProcurementThe list of suppliers approved to supply Nokturnal. Kept in Odoo at QMS › Suppliers › Approved Supplier List.
BOMBill of MaterialsProcurementA structured list of all components, sub-assemblies and raw materials needed to build a product, with quantities and part numbers. An eBOM is the engineering BOM used in ProtoRel.
CAPA / CARCorrective and Preventive Action / Corrective Action RequestQuality SystemThe record used to find a problem's root cause and fix it so it does not recur (SOP-1000-001). Tracked in Odoo at QMS › Nonconformance › CAPA Actions.
CCBChange Control BoardQuality SystemApproves Class I changes to released parts and moves parts to Obsolete (F-731-001, SOP-831-001).
CDRCritical Design ReviewDesign ReviewA formal review held mid-EngRel that establishes the design baseline. Follows PDR (P-830-002).
CRBConfiguration Review BoardQuality SystemThe board whose unanimous approval moves a part from Confirmed to Released, and which must approve the EngRel → ProdRel transition (F-731-001, P-830-002).
DVP&RDesign Verification and Validation Plan & ReportDesign ReviewThe workbook (F-830-003) that records how each design requirement is verified and validated, and the results (SOP-830-001).
EARExport Administration RegulationsComplianceU.S. regulations controlling the export of commercial and dual-use goods and technology (P-825-001).
ECOEngineering Change OrderQuality SystemThe authorization to implement an approved design or documentation change. Worked in Odoo at QMS › Change Management.
ECPEngineering Change ProposalQuality SystemA proposal to change a contract deliverable, submitted to the customer for approval before implementation.
ECREngineering Change RequestQuality SystemA request to change a design or document. It is reviewed first and, when approved, implemented through an ECO.
EngRelEngineering ReleaseDesign ReviewThe release state for a repeatable engineering baseline: versioned drawings, released Normal BOM and basic work instructions (P-830-002). Shown in Odoo as EngREL.
FAIFirst Article InspectionProductionInspection of the first production item to show the process can produce conforming product (AS9102). Recorded in Odoo under QMS › Manufacturing › First Article Inspection.
FIFOFirst In, First OutProductionAn inventory method where the oldest stock is used first.
ICDInterface Control DocumentDesign ReviewA document defining the physical and functional interfaces between systems or subsystems. Changes to ICDs always need documented review and approval (P-830-002).
IPIntellectual PropertyCompliancePatents, trade secrets, proprietary designs and technical data owned by Nokturnal or its customers. Must be protected per company policy and contract requirements.
ITARInternational Traffic in Arms RegulationsComplianceU.S. regulations controlling the export of defense articles, services and technical data (P-825-001).
KCKey CharacteristicDesign ReviewAn attribute or feature whose variation significantly affects product fit, performance, service life or manufacturability (SOP-814-001).
KPIKey Performance IndicatorQuality SystemA measure of a quality objective (F-520-001). Shown in Odoo at Home › KPI.
NCRNonconformance ReportQuality SystemA record of a product, service or process that does not meet a requirement. Raised in Odoo at QMS › Nonconformance and tracked to closure.
NPDNew Product DevelopmentDesign ReviewTaking a product from concept through design, verification, validation and release to production.
OERObjective Evidence RecordQuality SystemThe internal audit form (F-920-003) where auditors record evidence and nonconformances.
OFIOpportunity for ImprovementQuality SystemAn audit observation that is not a nonconformance but could improve the process (SOP-920-001).
OTDOn Time DeliveryProcurementThe share of deliveries made on or before the committed date. Targets: ≥ 90% to customers and ≥ 90% from suppliers (F-520-001).
PACProduct Acceptance by CustomerProductionThe rate at which customers accept delivered products without rejection. Target: ≥ 95% (F-520-001).
PDRPreliminary Design ReviewDesign ReviewAn early review of the design concept against requirements. ProtoRel moves to EngRel at PDR completion (P-830-002). Record: F-830-007.
PMPProgram Management PlanDesign ReviewThe program's plan (F-820-004 template), kept in Odoo at Programs & Projects › Program Control › Governance › PMPs.
PO / PRPurchase Order / Purchase RequestProcurementThe purchase request starts in Odoo with its quality clauses and flowdowns; after approval the buyer places the purchase order in Odoo (SOP-840-001).
ProdRelProduction ReleaseDesign ReviewThe release state for production: final BOM, drawings and work instructions, with formal ECR/ECO/CCB change control (P-830-002). Shown in Odoo as ProdREL.
ProtoRelPrototype ReleaseDesign ReviewThe release state for R&D and first builds: eBOM, iterative change control (P-830-002). Shown in Odoo as ProtoREL.
PSRProduct Safety RepresentativeQuality SystemThe individual(s) who coordinate product safety activities; may be the CEO, the Quality Manager or a designated Program Engineer (SOP-814-001).
QMSQuality Management SystemQuality SystemThe policies, processes, procedures and records that define how Nokturnal ensures product quality and continual improvement, built to AS9100.
REACHRegistration, Evaluation, Authorisation & Restriction of ChemicalsComplianceEU regulation controlling hazardous substances in products. Nokturnal informs customers of restricted substances when required.
RFQRequest for QuotationProcurementA request to suppliers for price and lead time on parts or services.
RoHSRestriction of Hazardous SubstancesComplianceEU directive limiting specific hazardous materials (e.g. lead, mercury, cadmium) in electronic products, where it applies.
SBIR / STTRSmall Business Innovation Research / Small Business Technology TransferProcurementFederal programs funding early-stage R&D; STTR requires collaboration with a research institution (SOP-851-001).
SOPStandard Operating ProcedureQuality SystemA controlled procedure. The controlled copy lives in the SharePoint Master Document Library and is indexed in Odoo's Document Map; always use the current revision.
SOWStatement of WorkProcurementThe contract document defining the tasks, deliverables, schedule and standards a contractor must meet.
SRASafety Risk AssessmentQuality SystemA systematic process to identify hazards, assess risks and set mitigations (SOP-814-001).
SWOTStrengths, Weaknesses, Opportunities & ThreatsComplianceThe analysis leadership uses with F-610-001 to assess risks and opportunities (SOP-610-001).
TRLTechnology Readiness LevelDesign ReviewA 1–9 scale of technology maturity. Research Services typically apply through TRL 6 (SOP-851-001).
TRRTest Readiness ReviewDesign ReviewA review confirming the product and test setup are ready for formal testing. EngRel → ProdRel follows CDR and TRR plus CRB approval (P-830-002).
WIPWork In ProgressProductionProducts or assemblies that have started the build but are not yet completed and accepted. Identification and traceability apply to WIP too.

No matching acronyms found. Try a different keyword.

Reviewed November 2026 against QM-001 2.1, F-520-001 1.1, SOP-750-001 2.0, SOP-820-001 1.1, SOP-820-002 1.2, SOP-830-001 1.2, P-830-002 2.0, SOP-831-001 1.0, SOP-814-001 1.0, SOP-840-001 1.1, SOP-850-001 1.1, SOP-851-001 1.0, SOP-870-001 1.0, SOP-920-001 1.0, F-920-001 1.0, SOP-1000-001 1.1, P-730-001 1.1 and P-825-001 1.0. · Owner: Management Representative (QM-001 §5.3) · For quality concerns, contact the Management Representative or the Quality Manager.